IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,093

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0648 # 04 Y:2009 04 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $36,798 $150,000 Implemented
MA0648 # 07 Y:2009 07 2009 COVER OPEN TANKS $5,857 $1,924 Implemented
MA0646 # 02 Y:2009 02 2009 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $5,780 $0 Implemented
MA0646 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,508 $300 Implemented
UM0351 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $37,050 $0 Implemented
UM0351 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,706 $19,921 Implemented
UM0351 # 05 Y:2009 05 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,656 $500 Implemented
UD0794 # 07 Y:2009 07 2009 UPGRADE CONTROLS ON COMPRESSORS $3,255 $0 Implemented
UD0794 # 08 Y:2009 08 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,202 $0 Implemented
UD0794 # 09 Y:2009 09 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,223 $1,000 Implemented
UD0793 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,450 $25,000 Implemented
UD0793 # 02 Y:2009 02 2009 INSULATE BARE EQUIPMENT $6,677 $1,000 Implemented
UD0793 # 04 Y:2009 04 2009 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,855 $0 Implemented
UD0793 # 06 Y:2009 06 2009 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,114 $0 Implemented
UD0793 # 07 Y:2009 07 2009 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,970 $1,000 Implemented
UD0793 # 08 Y:2009 08 2009 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $2,460 $2,500 Implemented
UD0793 # 09 Y:2009 09 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,488 $0 Implemented
UD0793 # 11 Y:2009 11 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $621 $1,000 Implemented
SU0279 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,367 $0 Implemented
SU0279 # 02 Y:2009 02 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,002 $0 Implemented
SU0279 # 04 Y:2009 04 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $319 $0 Implemented
SU0279 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,498 $748 Implemented
SU0279 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $204 $305 Implemented
SU0279 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,866 $10,242 Implemented
MA0644 # 01 Y:2009 01 2009 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $34,492 $160,000 Implemented