IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,321

matching recommendations
Reset
ARC 2.1 Combustion Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0071 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,654 $300 Implemented
CO0073 # 09 Y:1986 09 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $999 $300 Implemented
GT0302 # 04 Y:1986 04 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,257 $1,000 Not Implemented
TN0290 # 05 Y:1986 05 1986 INSTALL TURBULATORS $469 $500 Implemented
TN0287 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,791 $0 Not Implemented
TN0289 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $32,373 $4,500 Implemented
TN0291 # 04 Y:1986 04 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $518 $0 Implemented
CO0074 # 11 Y:1986 11 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,405 $1,000 Not Implemented
KU0210 # 05 Y:1986 05 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $726 $1,200 Not Implemented
OK0210 # 04 Y:1986 04 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,923 $1,500 Implemented
LT0071 # 02 Y:1986 02 1986 REDUCE EXCESSIVE BOILER BLOWDOWN $20,288 $9,000 Implemented
AT0054 # 07 Y:1986 07 1986 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $644 $500 Implemented
LT0075 # 05 Y:1986 05 1986 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $532 $200 Implemented
LT0076 # 01 Y:1986 01 1986 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $6,000 $100 Not Implemented
LT0079 # 04 Y:1986 04 1986 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $4,361 $750 Implemented
KU0208 # 05 Y:1986 05 1986 INSTALL AUTOMATIC STACK DAMPER $655 $200 Implemented
KU0208 # 07 Y:1986 07 1986 INSTALL AUTOMATIC STACK DAMPER $317 $600 Implemented
KU0209 # 03 Y:1986 03 1986 INSTALL AUTOMATIC STACK DAMPER $19,573 $13,500 Not Implemented
ST0073 # 03 Y:1986 03 1986 INSTALL AUTOMATIC STACK DAMPER $7,099 $4,042 Implemented
ST0077 # 02 Y:1986 02 1986 INSTALL AUTOMATIC STACK DAMPER $878 $846 Implemented
ST0078 # 02 Y:1986 02 1986 INSTALL AUTOMATIC STACK DAMPER $2,122 $1,034 Not Implemented
KU0207 # 17 Y:1986 17 1986 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $160 $300 Implemented
OK0208 # 04 Y:1986 04 1986 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $207 $78 Implemented
GT0298 # 06 Y:1986 06 1986 CONTROL PRESSURE ON STEAMER OPERATIONS $7,600 $2,280 Not Implemented
CO0068 # 02 Y:1986 02 1986 INSTALL TURBULATORS $9,291 $1,200 Not Implemented