IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,028

matching recommendations
Reset
ARC 2.2 Thermal Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0245 # 08 Y:2006 08 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $2,379 $791 Not Implemented
SU0245 # 06 Y:2006 06 2006 REPAIR AND ELIMINATE STEAM LEAKS $4,759 $318 Implemented
UU0108 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,120 $4,365 Not Implemented
SU0245 # 13 Y:2006 13 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,910 $30,045 Not Implemented
SU0245 # 14 Y:2006 14 2006 INSULATE BARE EQUIPMENT $2,426 $6,975 Implemented
SD0387 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,871 $4,125 Not Implemented
UM0312 # 07 Y:2006 07 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,826 $1,300 Not Implemented
WV0352 # 10 Y:2006 10 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $473 $325 Not Implemented
WV0352 # 12 Y:2006 12 2006 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $325 $38 Not Implemented
WV0351 # 13 Y:2006 13 2006 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $398 $7 Not Implemented
WV0351 # 04 Y:2006 04 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,773 $3,473 Not Implemented
WV0351 # 12 Y:2006 12 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $630 $1,336 Not Implemented
NC0345 # 01 Y:2006 01 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,498 $4,000 Not Implemented
OR0507 # 03 Y:2006 03 2006 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $13,600 $3,200 Not Implemented
OR0507 # 01 Y:2006 01 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,600 $0 Implemented
OR0507 # 11 Y:2006 11 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,800 $2,600 Not Implemented
OR0507 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $1,600 $1,200 Not Implemented
OR0507 # 16 Y:2006 16 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $77,400 $330,000 Not Implemented
LE0247 # 05 Y:2006 05 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,245 $15,000 Not Implemented
OR0506 # 05 Y:2006 05 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,200 $3,600 Implemented
LE0247 # 07 Y:2006 07 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,225 $1,152 Implemented
LE0247 # 03 Y:2006 03 2006 REPAIR OR REPLACE STEAM TRAPS $26,312 $16,000 Not Implemented
OR0504 # 01 Y:2006 01 2006 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $64,300 $20,000 Implemented
OR0503 # 06 Y:2006 06 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $5,341 $600 Implemented
WV0350 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $44,076 $2,440 Implemented