Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20,450
matching recommendationsARC | 2.2 | Thermal Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0268 # 04 Y:2025 | 04 | 2025 | INCREASE AMOUNT OF CONDENSATE RETURNED | $31,296 | $7,800 | n/a |
UU0268 # 06 Y:2025 | 06 | 2025 | USE OPTIMUM TEMPERATURE | $680,810 | $2,017,330 | n/a |
MU0063 # 01 Y:2025 | 01 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,493 | $7,331 | n/a |
UU0267 # 03 Y:2025 | 03 | 2025 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $6,322 | $119,100 | n/a |
UF0627 # 02 Y:2025 | 02 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $16,402 | $72,000 | n/a |
UF0627 # 05 Y:2025 | 05 | 2025 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $3,491 | $0 | n/a |
LE0596 # 03 Y:2025 | 03 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $26,110 | $14,500 | n/a |
WV0678 # 05 Y:2025 | 05 | 2025 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $11,667 | $55,000 | n/a |
WV0678 # 06 Y:2025 | 06 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $5,185 | $11,425 | n/a |
WV0678 # 10 Y:2025 | 10 | 2025 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $4,453 | $20,950 | n/a |
WV0678 # 18 Y:2025 | 18 | 2025 | INSULATE BARE EQUIPMENT | $664 | $914 | n/a |
AM0943 # 02 Y:2025 | 02 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $25,900 | $50,000 | n/a |
AM0943 # 06 Y:2025 | 06 | 2025 | USE OPTIMUM THICKNESS INSULATION | $5,170 | $170 | n/a |
AM0943 # 07 Y:2025 | 07 | 2025 | USE OPTIMUM THICKNESS INSULATION | $4,270 | $6,012 | n/a |
AM0943 # 11 Y:2025 | 11 | 2025 | REPAIR OR REPLACE STEAM TRAPS | $780 | $1,869 | n/a |
SF0634 # 08 Y:2025 | 08 | 2025 | HEAT WATER WITH EXHAUST HEAT | $9,559 | $18,756 | n/a |
DL0255 # 07 Y:2025 | 07 | 2025 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,100 | $25,000 | n/a |
DL0255 # 09 Y:2025 | 09 | 2025 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $9,008 | $0 | n/a |
WM0241 # 04 Y:2025 | 04 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $552 | $635 | n/a |
WV0677 # 06 Y:2025 | 06 | 2025 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $3,254 | $14,320 | n/a |
WV0677 # 09 Y:2025 | 09 | 2025 | INSULATE BARE EQUIPMENT | $290 | $446 | n/a |
NL0109 # 01 Y:2025 | 01 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $45,070 | $240,000 | n/a |
UL2501 # 06 Y:2025 | 06 | 2025 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $141,151 | $58,367 | n/a |
DL0254 # 04 Y:2025 | 04 | 2025 | INSULATE BARE EQUIPMENT | $3,650 | $4,699 | n/a |
DL0253 # 06 Y:2025 | 06 | 2025 | INSULATE BARE EQUIPMENT | $2,662 | $3,300 | n/a |