IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

730

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0305 # 06 Y:2000 06 2000 AUTOMATE FINISHING PROCESS $15,000 $41,800 Implemented
ME0305 # 05 Y:2000 05 2000 MINIMIZE WATER USAGE $325 $225 Implemented
ME0305 # 03 Y:2000 03 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $366 $357 Implemented
ME0305 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $396 $1,193 Implemented
ME0305 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,013 $340 Implemented
ME0304 # 05 Y:2000 05 2000 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $29,835 $4,434 Implemented
ME0304 # 04 Y:2000 04 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $1,848 $0 Implemented
ME0298 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,392 $340 Implemented
ME0298 # 01 Y:2000 01 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,240 $66,900 Implemented
ME0293 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $262 $200 Implemented
ME0293 # 04 Y:2000 04 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,183 $0 Implemented
ME0292 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,822 $340 Implemented
ME0292 # 14 Y:2000 14 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $40 $0 Implemented
ME0292 # 08 Y:2000 08 2000 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $310 $240 Implemented
ME0290 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,690 $5,000 Implemented
ME0290 # 03 Y:2000 03 2000 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,732 $1,800 Implemented
ME0290 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,685 $2,475 Implemented
ME0290 # 08 Y:2000 08 2000 MOVE PRODUCT USING MECHANICAL MEANS $26,063 $13,600 Implemented
ME0291 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,828 $160 Implemented
ME0291 # 06 Y:2000 06 2000 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $694 $160 Implemented
ME0291 # 03 Y:2000 03 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $3,294 $4,112 Implemented
ME0289 # 05 Y:2000 05 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,507 $2,400 Implemented
ME0289 # 02 Y:2000 02 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $3,387 $3,165 Implemented
ME0288 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,432 $590 Implemented
ME0288 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,482 $14,072 Implemented