Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,391
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0198 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,448 | $300 | Implemented |
NC0198 # 04 Y:2000 | 04 | 2000 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,264 | $0 | Implemented |
NC0198 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,845 | $820 | Implemented |
NC0199 # 02 Y:2000 | 02 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,374 | $7,490 | Implemented |
NC0199 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,352 | $210 | Implemented |
NC0199 # 06 Y:2000 | 06 | 2000 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $5,140 | $0 | Implemented |
NC0192 # 03 Y:2000 | 03 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,432 | $3,250 | Implemented |
NC0195 # 01 Y:2000 | 01 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $150,957 | $214,000 | Implemented |
NC0195 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,306 | $300 | Implemented |
NC0195 # 03 Y:2000 | 03 | 2000 | DISCONNECT BALLASTS | $7,600 | $6,350 | Implemented |
NC0195 # 05 Y:2000 | 05 | 2000 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $6,839 | $3,180 | Implemented |
NC0193 # 02 Y:2000 | 02 | 2000 | DEVELOP A REPAIR/REPLACE POLICY | $3,831 | $3,617 | Implemented |
NC0194 # 01 Y:2000 | 01 | 2000 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $429 | $835 | Implemented |
NC0194 # 02 Y:2000 | 02 | 2000 | INSTALL SKYLIGHTS | $3,443 | $7,000 | Implemented |
NC0194 # 03 Y:2000 | 03 | 2000 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $13,561 | $29,000 | Implemented |
NC0194 # 05 Y:2000 | 05 | 2000 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $29,846 | $20,200 | Implemented |
NC0188 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $600 | $440 | Implemented |
NC0188 # 05 Y:2000 | 05 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,106 | $500 | Implemented |
NC0188 # 07 Y:2000 | 07 | 2000 | BURN WOOD BY-PRODUCTS FOR HEAT | $3,120 | $0 | Implemented |
NC0186 # 04 Y:2000 | 04 | 2000 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $12,321 | $4,000 | Implemented |
NC0191 # 01 Y:2000 | 01 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,005 | $1,000 | Implemented |
NC0191 # 02 Y:2000 | 02 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,096 | $1,753 | Implemented |
NC0191 # 03 Y:2000 | 03 | 2000 | INSULATE BARE EQUIPMENT | $545 | $1,050 | Implemented |
NC0191 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $701 | $0 | Implemented |
NC0191 # 06 Y:2000 | 06 | 2000 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $29,945 | $40,000 | Implemented |