Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,557
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0659 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,179 | $4,683 | Implemented |
OK0659 # 06 Y:2003 | 06 | 2003 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $7,958 | $100 | Implemented |
OK0661 # 02 Y:2003 | 02 | 2003 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $20,400 | $0 | Implemented |
OK0661 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,319 | $823 | Implemented |
OK0661 # 08 Y:2003 | 08 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $13,061 | $45,000 | Implemented |
OK0661 # 09 Y:2003 | 09 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $11,440 | $2,500 | Implemented |
OK0658 # 01 Y:2003 | 01 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $51,704 | $45,000 | Implemented |
OK0658 # 03 Y:2003 | 03 | 2003 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,031 | $0 | Implemented |
OK0658 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,978 | $367 | Implemented |
OK0658 # 05 Y:2003 | 05 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,150 | $5,273 | Implemented |
OK0658 # 08 Y:2003 | 08 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,609 | $30,876 | Implemented |
OK0658 # 09 Y:2003 | 09 | 2003 | INSTALL OCCUPANCY SENSORS | $6,270 | $2,004 | Implemented |
OK0657 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,220 | $25 | Implemented |
OK0657 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,257 | $320 | Implemented |
OK0657 # 08 Y:2003 | 08 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,624 | $11,750 | Implemented |
OK0653 # 02 Y:2003 | 02 | 2003 | USE OPTIMUM THICKNESS INSULATION | $14,697 | $8,210 | Implemented |
OK0650 # 01 Y:2002 | 01 | 2002 | INSTALL OCCUPANCY SENSORS | $1,203 | $1,190 | Implemented |
OK0650 # 02 Y:2002 | 02 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,073 | $100 | Implemented |
OK0648 # 01 Y:2002 | 01 | 2002 | USE OPTIMUM THICKNESS INSULATION | $12,108 | $2,317 | Implemented |
OK0648 # 04 Y:2002 | 04 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,975 | $4,500 | Implemented |
OK0648 # 07 Y:2002 | 07 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,683 | $240 | Implemented |
OK0646 # 02 Y:2002 | 02 | 2002 | INSTALL SET-BACK TIMERS | $469 | $93 | Implemented |
OK0646 # 03 Y:2002 | 03 | 2002 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $659 | $0 | Implemented |
OK0646 # 04 Y:2002 | 04 | 2002 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $13,960 | $0 | Implemented |
OK0646 # 07 Y:2002 | 07 | 2002 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,545 | $5,270 | Implemented |