IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,946

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0696 # 01 Y:2000 01 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $184,000 $44,000 Implemented
TN0696 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $68,153 $6,800 Implemented
TN0696 # 06 Y:2000 06 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $35,400 $18,900 Implemented
TN0696 # 08 Y:2000 08 2000 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $33,720 $5,075 Implemented
TN0694 # 11 Y:2000 11 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $1,365 $0 Implemented
TN0694 # 03 Y:2000 03 2000 DEVELOP A REPAIR/REPLACE POLICY $10,755 $5,075 Implemented
TN0694 # 02 Y:2000 02 2000 ADD AREA LIGHTING SWITCHES $17,510 $25,030 Implemented
TN0693 # 03 Y:2000 03 2000 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $22,100 $8,120 Implemented
TN0693 # 08 Y:2000 08 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,357 $490 Implemented
TN0693 # 04 Y:2000 04 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $12,000 $35,070 Implemented
TN0693 # 02 Y:2000 02 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $69,815 $1,200 Implemented
TN0692 # 07 Y:2000 07 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,600 $900 Implemented
TN0692 # 05 Y:2000 05 2000 RECOVER AND REUSE WASTE MATERIAL $4,210 $0 Implemented
TN0692 # 02 Y:2000 02 2000 ADD ADDITIONAL PRODUCTION SHIFT $899,000 $967,000 Implemented
TN0692 # 09 Y:2000 09 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,115 $1,300 Implemented
TN0692 # 06 Y:2000 06 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $3,650 $0 Implemented
TN0692 # 08 Y:2000 08 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,336 $0 Implemented
TN0691 # 08 Y:2000 08 2000 USE RE-USABLE FILTERS $640 $0 Implemented
TN0690 # 03 Y:2000 03 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $93,903 $3,930 Implemented
TN0690 # 02 Y:2000 02 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $164,990 $183,505 Implemented
TN0689 # 07 Y:2000 07 2000 INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION $4,345 $300 Implemented
TN0689 # 08 Y:2000 08 2000 ADD AREA LIGHTING SWITCHES $3,620 $6,160 Implemented
TN0689 # 01 Y:2000 01 2000 INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION $97,005 $100,000 Implemented
TN0689 # 04 Y:2000 04 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,245 $5,625 Implemented
TN0688 # 02 Y:2000 02 2000 INSTALL EQUIPMENT TO MOVE PRODUCT $211,827 $100,400 Implemented