Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,458
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1019 # 01 Y:2020 | 01 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,684 | $0 | Implemented |
UD1019 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,619 | $82,620 | Implemented |
UD1017 # 01 Y:2020 | 01 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $20,892 | $0 | Implemented |
UD1017 # 02 Y:2020 | 02 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,500 | $0 | Implemented |
UD1017 # 03 Y:2020 | 03 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,662 | $17,500 | Implemented |
UD1017 # 04 Y:2020 | 04 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $2,299 | $0 | Implemented |
UD1016 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $966 | $0 | Implemented |
UD1016 # 05 Y:2020 | 05 | 2020 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $8,764 | $42,000 | Implemented |
UD1016 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,232 | $18,000 | Implemented |
UD1015 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,207 | $0 | Implemented |
UD1015 # 03 Y:2020 | 03 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,267 | $0 | Implemented |
UD1015 # 07 Y:2020 | 07 | 2020 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $6,591 | $0 | Implemented |
UD1014 # 05 Y:2020 | 05 | 2020 | INSULATE BARE EQUIPMENT | $28,500 | $18,326 | Implemented |
UD1013 # 01 Y:2020 | 01 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,208 | $0 | Implemented |
UD1013 # 05 Y:2020 | 05 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,951 | $5,000 | Implemented |
UD1013 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,346 | $1,000 | Implemented |
UD1013 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,239 | $14,500 | Implemented |
UD1012 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,178 | $1,000 | Implemented |
UD1012 # 06 Y:2020 | 06 | 2020 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $67,773 | $0 | Implemented |
UD1012 # 07 Y:2020 | 07 | 2020 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $49,540 | $21,295 | Implemented |
UD1012 # 09 Y:2020 | 09 | 2020 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $27,338 | $0 | Implemented |
UD1012 # 14 Y:2020 | 14 | 2020 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,073 | $0 | Implemented |
UD1012 # 15 Y:2020 | 15 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,548 | $0 | Implemented |
UD1012 # 16 Y:2020 | 16 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,160 | $0 | Implemented |
UD1012 # 17 Y:2020 | 17 | 2020 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $24,810 | $35,000 | Implemented |