Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
262
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2311 # 03 Y:2023 | 03 | 2023 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $4,286 | $1,600 | Implemented |
UL2311 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,819 | $13,218 | Implemented |
UL2311 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,230 | $1,980 | Implemented |
UL2311 # 07 Y:2023 | 07 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $3,418 | $1,000 | Implemented |
UL2307 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,654 | $33,973 | Implemented |
UL2307 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $1,100 | $2,693 | Implemented |
UL2307 # 07 Y:2023 | 07 | 2023 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $36,790 | $34,740 | Implemented |
UL2306 # 02 Y:2023 | 02 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $336 | $600 | Implemented |
UL2305 # 08 Y:2023 | 08 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,779 | $0 | Implemented |
UL2305 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,738 | $0 | Implemented |
UL2305 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,322 | $500 | Implemented |
UL2301 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,408 | $2,832 | Implemented |
UL2304 # 05 Y:2023 | 05 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,246 | $1,300 | Implemented |
UL2304 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $96,568 | $26,328 | Implemented |
UL2217 # 06 Y:2022 | 06 | 2022 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,602 | $50,000 | Implemented |
UL2217 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,163 | $19,500 | Implemented |
UL2217 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,426 | $0 | Implemented |
UL2217 # 10 Y:2022 | 10 | 2022 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $22,146 | $30,000 | Implemented |
UL2217 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $32,626 | $94,199 | Implemented |
UL2217 # 09 Y:2022 | 09 | 2022 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $33,279 | $0 | Implemented |
UL2216 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,227 | $10,882 | Implemented |
UL2216 # 05 Y:2022 | 05 | 2022 | OPTIMIZE PLANT POWER FACTOR | $67,103 | $45,461 | Implemented |
UL2216 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,213 | $960 | Implemented |
UL2216 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $1,196 | $2,730 | Implemented |
UL2216 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,028 | $0 | Implemented |