Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,245
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0241 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $910 | $75 | Implemented |
UM0239 # 01 Y:2003 | 01 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $247,018 | $270,000 | Implemented |
UM0239 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $82,330 | $148,050 | Implemented |
UM0239 # 04 Y:2003 | 04 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $35,180 | $1,100 | Implemented |
UM0239 # 07 Y:2003 | 07 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,815 | $300 | Implemented |
UM0240 # 01 Y:2003 | 01 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $28,120 | $1,000 | Implemented |
UM0240 # 02 Y:2003 | 02 | 2003 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $17,060 | $5,000 | Implemented |
UM0240 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $16,440 | $2,500 | Implemented |
UM0240 # 05 Y:2003 | 05 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $14,410 | $5,000 | Implemented |
UM0240 # 07 Y:2003 | 07 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,305 | $500 | Implemented |
UM0240 # 09 Y:2003 | 09 | 2003 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,550 | $1,100 | Implemented |
UM0238 # 02 Y:2003 | 02 | 2003 | COVER OPEN TANKS | $28,130 | $2,624 | Implemented |
UM0238 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,950 | $150 | Implemented |
UM0238 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $6,485 | $8,300 | Implemented |
UM0238 # 07 Y:2003 | 07 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,520 | $895 | Implemented |
UM0237 # 02 Y:2003 | 02 | 2003 | ISOLATE HOT OR COLD EQUIPMENT | $11,459 | $10,000 | Implemented |
UM0237 # 04 Y:2003 | 04 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,937 | $1,650 | Implemented |
UM0236 # 03 Y:2003 | 03 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,861 | $2,500 | Implemented |
UM0235 # 03 Y:2003 | 03 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,576 | $9,600 | Implemented |
UM0235 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,415 | $675 | Implemented |
UM0234 # 01 Y:2003 | 01 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $71,900 | $180,000 | Implemented |
UM0234 # 04 Y:2003 | 04 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,603 | $120,000 | Implemented |
UM0233 # 02 Y:2003 | 02 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,064 | $500 | Implemented |
UM0233 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,745 | $150 | Implemented |
UM0233 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,037 | $50 | Implemented |