Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
53
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0382 # 07 Y:2000 | 07 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,081 | $6,484 | Implemented |
WI0382 # 05 Y:2000 | 05 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $5,144 | $0 | Implemented |
WI0381 # 12 Y:2000 | 12 | 2000 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $124 | $300 | Implemented |
WI0381 # 08 Y:2000 | 08 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,028 | $1,300 | Implemented |
WI0381 # 04 Y:2000 | 04 | 2000 | INSTALL AUTOMATIC STACK DAMPER | $1,157 | $1,000 | Implemented |
WI0381 # 03 Y:2000 | 03 | 2000 | INSTALL TIMERS AND/OR THERMOSTATS | $3,541 | $0 | Implemented |
WI0381 # 02 Y:2000 | 02 | 2000 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,183 | $4,000 | Implemented |
WI0379 # 06 Y:2000 | 06 | 2000 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $2,945 | $8,000 | Implemented |
WI0379 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $473 | $90 | Implemented |
WI0378 # 10 Y:2000 | 10 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $279 | $820 | Implemented |
WI0377 # 07 Y:2000 | 07 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $13,592 | $8,205 | Implemented |
WI0377 # 12 Y:2000 | 12 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $272 | $60 | Implemented |
WI0377 # 09 Y:2000 | 09 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,343 | $7,200 | Implemented |
WI0377 # 08 Y:2000 | 08 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,629 | $23,136 | Implemented |
WI0377 # 01 Y:2000 | 01 | 2000 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $52,550 | $0 | Implemented |
WI0375 # 08 Y:2000 | 08 | 2000 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,855 | $500 | Implemented |
WI0375 # 03 Y:2000 | 03 | 2000 | ELIMINATE SHIFT | $208,000 | $0 | Implemented |
WI0375 # 02 Y:2000 | 02 | 2000 | CONDENSE OPERATION INTO ONE BUILDING | $280,000 | $60,000 | Implemented |
WI0375 # 01 Y:2000 | 01 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $416,000 | $140,000 | Implemented |
WI0374 # 12 Y:2000 | 12 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $426 | $2,040 | Implemented |
WI0374 # 03 Y:2000 | 03 | 2000 | MODIFY WORKLOAD | $34,000 | $2,000 | Implemented |
WI0374 # 07 Y:2000 | 07 | 2000 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $2,711 | $8,000 | Implemented |
WI0374 # 10 Y:2000 | 10 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $514 | $120 | Implemented |
WI0374 # 08 Y:2000 | 08 | 2000 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,394 | $500 | Implemented |
WI0373 # 04 Y:2000 | 04 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,969 | $2,196 | Implemented |