IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,631

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0197 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $813 $23 Implemented
WV0197 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $669 $610 Implemented
WV0197 # 05 Y:2000 05 2000 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,365 $920 Implemented
WV0196 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $321 $80 Implemented
WV0196 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $11,584 $699 Implemented
WV0196 # 04 Y:2000 04 2000 USE OPTIMUM THICKNESS INSULATION $264 $298 Implemented
WV0196 # 05 Y:2000 05 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11,981 $688 Implemented
WV0196 # 07 Y:2000 07 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $950 $20 Implemented
WV0196 # 08 Y:2000 08 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $328 $401 Implemented
WV0196 # 09 Y:2000 09 2000 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,040 $150 Implemented
UD0599 # 02 Y:2000 02 2000 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $8,795 $0 Implemented
UD0599 # 03 Y:2000 03 2000 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,987 $20,000 Implemented
UD0599 # 04 Y:2000 04 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,956 $2,500 Implemented
UD0599 # 06 Y:2000 06 2000 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $2,628 $0 Implemented
UD0599 # 07 Y:2000 07 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,401 $1,000 Implemented
UD0598 # 02 Y:2000 02 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $22,073 $34,288 Implemented
UD0598 # 05 Y:2000 05 2000 CHECK FOR ACCURACY OF UTILITY / POWER METERS $9,640 $0 Implemented
UD0598 # 06 Y:2000 06 2000 USE MINIMUM STEAM OPERATING PRESSURE $3,333 $0 Implemented
UD0598 # 08 Y:2000 08 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $1,720 $500 Implemented
UD0598 # 09 Y:2000 09 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,088 $4,253 Implemented
UD0597 # 02 Y:2000 02 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $14,291 $1,360 Implemented
UD0597 # 04 Y:2000 04 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,800 $3,000 Implemented
UD0596 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,200 $27,423 Implemented
UD0596 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $4,221 $1,200 Implemented
WV0190 # 01 Y:2000 01 2000 IMPROVE COMBUSTION CONTROL CAPABILITY $204,769 $34,000 Implemented