Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,891
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0734 # 07 Y:2006 | 07 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $3,000 | $500 | Implemented |
OK0721 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $486 | $415 | Implemented |
OK0721 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,586 | $31,632 | Implemented |
OK0721 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,837 | $13,148 | Implemented |
OK0703 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,044 | $25,020 | Implemented |
OK0703 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $36,596 | $39,180 | Implemented |
OK0703 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,204 | $1,727 | Implemented |
OK0703 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,018 | $22,540 | Implemented |
OK0691 # 02 Y:2004 | 02 | 2004 | EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME | $270,439 | $2,825 | Implemented |
OK0691 # 03 Y:2004 | 03 | 2004 | INSTALL SET-BACK TIMERS | $6,531 | $3,832 | Implemented |
OK0691 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,036 | $559 | Implemented |
OK0691 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $265 | $0 | Implemented |
OK0691 # 07 Y:2004 | 07 | 2004 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $886 | $139 | Implemented |
OK0657 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,220 | $25 | Implemented |
OK0657 # 03 Y:2003 | 03 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,257 | $320 | Implemented |
OK0657 # 08 Y:2003 | 08 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,624 | $11,750 | Implemented |
OK0645 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,887 | $220 | Implemented |
OK0645 # 05 Y:2002 | 05 | 2002 | INSTALL OCCUPANCY SENSORS | $176 | $163 | Implemented |
OK0645 # 06 Y:2002 | 06 | 2002 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $61,280 | $44,000 | Implemented |
OK0643 # 01 Y:2002 | 01 | 2002 | INSTALL SET-BACK TIMERS | $3,635 | $558 | Implemented |
OK0643 # 04 Y:2002 | 04 | 2002 | INSULATE BARE EQUIPMENT | $1,163 | $1,440 | Implemented |
OK0643 # 06 Y:2002 | 06 | 2002 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $117,500 | $4,800 | Implemented |
OK0643 # 07 Y:2002 | 07 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,970 | $300 | Implemented |
OK0644 # 02 Y:2002 | 02 | 2002 | INSTALL SPECTRAL REFLECTORS / DELAMP | $570 | $3 | Implemented |
OK0644 # 03 Y:2002 | 03 | 2002 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,441 | $1,738 | Implemented |