Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,313
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0713 # 05 Y:2018 | 05 | 2018 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,108 | $5,028 | Implemented |
OR0713 # 04 Y:2018 | 04 | 2018 | UPGRADE CONTROLS ON COMPRESSORS | $7,018 | $26,371 | Implemented |
OR0713 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,959 | $10,959 | Implemented |
OR0713 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,594 | $4,336 | Implemented |
OR0713 # 06 Y:2018 | 06 | 2018 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $929 | $0 | Implemented |
IP0111 # 09 Y:2018 | 09 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $180 | $679 | Implemented |
OK0993 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $626 | $5,696 | Implemented |
MZ0260 # 02 Y:2018 | 02 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $577 | $450 | Implemented |
NL0027 # 05 Y:2018 | 05 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $326 | $1,000 | Implemented |
IP0111 # 01 Y:2018 | 01 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,378 | $0 | Implemented |
NL0027 # 01 Y:2018 | 01 | 2018 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $24,797 | $32,620 | Implemented |
NL0027 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,840 | $74,980 | Implemented |
MZ0260 # 01 Y:2018 | 01 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,384 | $25,688 | Implemented |
OK0993 # 01 Y:2018 | 01 | 2018 | OPTIMIZE PLANT POWER FACTOR | $11,376 | $41,363 | Implemented |
IP0111 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $780 | $217 | Implemented |
OK0993 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,437 | $19,768 | Implemented |
IP0111 # 04 Y:2018 | 04 | 2018 | INSTALL OCCUPANCY SENSORS | $1,101 | $893 | Implemented |
MZ0260 # 03 Y:2018 | 03 | 2018 | INSTALL OCCUPANCY SENSORS | $32,450 | $7,600 | Implemented |
OR0712 # 01 Y:2018 | 01 | 2018 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $200,991 | $689,600 | Implemented |
OR0712 # 05 Y:2018 | 05 | 2018 | INSULATE BARE EQUIPMENT | $17,619 | $17,511 | Implemented |
OR0712 # 06 Y:2018 | 06 | 2018 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $6,403 | $30,000 | Implemented |
GT0919 # 02 Y:2018 | 02 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $67,773 | $8,000 | Implemented |
WV0568 # 04 Y:2018 | 04 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $1,251 | $562 | Implemented |
GT0919 # 06 Y:2018 | 06 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $90,950 | $1,944,000 | Implemented |
MI0345 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,969 | $3,100 | Implemented |