IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,328

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL2016 # 06 Y:2020 06 2020 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $797 $0 Implemented
CL2016 # 07 Y:2020 07 2020 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $567 $0 Implemented
CL2016 # 08 Y:2020 08 2020 RECOVER WASTE HEAT FROM EQUIPMENT $4,055 $2,500 Implemented
IP0142 # 02 Y:2020 02 2020 COMBINE UTILITY METERS $494 $0 Implemented
IP0142 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $94 $40 Implemented
IP0142 # 07 Y:2020 07 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $804 $728 Implemented
IP0142 # 10 Y:2020 10 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,597 $14,185 Implemented
SF0563 # 02 Y:2020 02 2020 INSULATE BARE EQUIPMENT $339 $227 Implemented
SF0563 # 03 Y:2020 03 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,582 $2,866 Implemented
SF0563 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,879 $17,947 Implemented
SF0563 # 05 Y:2020 05 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,998 $71,975 Implemented
MI0379 # 01 Y:2020 01 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $192,230 $217,000 Implemented
SD0602 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,898 $2,500 Implemented
UF0555 # 01 Y:2020 01 2020 INCREASE EFFICIENCY OF TRUCKS $70,950 $336,000 Implemented
UF0555 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,846 $7,217 Implemented
UF0555 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $2,700 $10,047 Implemented
UF0555 # 04 Y:2020 04 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,821 $3,900 Implemented
UF0555 # 05 Y:2020 05 2020 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $340,000 $5,859 Implemented
UD1025 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,051 $340 Implemented
CW0115 # 03 Y:2020 03 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $233 $22 Implemented
CW0115 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $333 $90 Implemented
CW0115 # 06 Y:2020 06 2020 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $28 $188 Implemented
CW0115 # 08 Y:2020 08 2020 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,017 $10,620 Implemented
NC0655 # 04 Y:2020 04 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $310 $500 Implemented
SF0562 # 01 Y:2020 01 2020 INSULATE BARE EQUIPMENT $1,259 $918 Implemented