IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

119

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0678 # 06 Y:1999 06 1999 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $35,980 $0 Implemented
GT0678 # 01 Y:1999 01 1999 METER WASTE WATER $4,925 $900 Implemented
UL0230 # 06 Y:1999 06 1999 $83,800 $80,000 Implemented
UL0230 # 07 Y:1999 07 1999 $1,500 $0 Implemented
UL0230 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,353 $500 Implemented
UL0230 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,394 $40 Implemented
UL0230 # 08 Y:1999 08 1999 $2,893 $2,120 Implemented
IA0232 # 06 Y:1999 06 1999 RECYCLE CLEANING SOLVENT AND REUSE $33,891 $10,300 Implemented
IA0232 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,827 $537 Implemented
TP0008 # 01 Y:1999 01 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $24,189 $1,848 Implemented
WI0360 # 11 Y:1999 11 1999 REDUCE VENTILATION AIR $1,891 $500 Implemented
WI0360 # 10 Y:1999 10 1999 INSTALL OCCUPANCY SENSORS $2,640 $5,800 Implemented
WI0360 # 08 Y:1999 08 1999 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,510 $400 Implemented
WI0360 # 09 Y:1999 09 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,092 $500 Implemented
UD0583 # 01 Y:1999 01 1999 $6,264 $0 Implemented
UD0582 # 03 Y:1999 03 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $19,416 $3,300 Implemented
UD0582 # 02 Y:1999 02 1999 $38,800 $0 Implemented
UD0582 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,601 $16,538 Implemented
AS0261 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,589 $21,494 Implemented
AS0261 # 07 Y:1999 07 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $925 $120 Implemented
AS0261 # 06 Y:1999 06 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,852 $3,385 Implemented
AS0261 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $285 $319 Implemented
WV0179 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $200 $174 Implemented
WV0179 # 06 Y:1999 06 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,773 $7,500 Implemented
IA0230 # 11 Y:1999 11 1999 $1,458 $50 Implemented