IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0722 # 05 Y:2001 05 2001 INSULATE FEEDWATER TANK $153 $220 Implemented
GT0722 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $851 $2,902 Implemented
GT0722 # 01 Y:2001 01 2001 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $16,455 $5,110 Implemented
GT0720 # 07 Y:2001 07 2001 REDUCE EXCESSIVE BOILER BLOWDOWN $1,320 $50 Implemented
GT0720 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $277 $324 Implemented
GT0720 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,472 $6,151 Implemented
GT0720 # 02 Y:2001 02 2001 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,475 $600 Implemented
GT0720 # 01 Y:2001 01 2001 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $337 $1,000 Implemented
GT0715 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,725 $28,875 Implemented
GT0715 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,380 $0 Implemented
GT0715 # 07 Y:2001 07 2001 USE LESS WASTEFUL PACKAGING $1,754 $0 Implemented
GT0713 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,175 $200 Implemented
GT0713 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,580 $3,750 Implemented
GT0713 # 02 Y:2001 02 2001 USE POWER DURING OFF-PEAK PERIODS $2,767 $0 Implemented
GT0711 # 05 Y:2001 05 2001 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $15 $0 Implemented
GT0711 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $845 $1,450 Implemented
GT0714 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $630 $250 Implemented
GT0714 # 05 Y:2001 05 2001 $98,120 $175,000 Implemented
GT0710 # 07 Y:2001 07 2001 $156,450 $5,200 Implemented
GT0710 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $865 $2,450 Implemented
GT0710 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,305 $4,030 Implemented
GT0710 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,085 $300 Implemented
GT0707 # 03 Y:2001 03 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $2,040 $6,700 Implemented
GT0707 # 07 Y:2001 07 2001 $45,820 $0 Implemented
GT0707 # 06 Y:2001 06 2001 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $7,808 $0 Implemented