IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

178

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0886 # 06 Y:2014 06 2014 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $10,866 $0 Implemented
OK0886 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $870 $200 Implemented
OK0886 # 09 Y:2014 09 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $548 $686 Implemented
OK0886 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $555 $1,660 Implemented
OK0886 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,721 $11,599 Implemented
OK0823 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $5,300 $16,148 Implemented
OK0823 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $922 $2,975 Implemented
MZ0048 # 02 Y:2010 02 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,520 $1,160 Implemented
MZ0048 # 03 Y:2010 03 2010 OPTIMIZE PLANT POWER FACTOR $36,058 $92,296 Implemented
MZ0048 # 05 Y:2010 05 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $5,639 $0 Implemented
OK0767 # 08 Y:2008 08 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,751 $0 Implemented
OK0767 # 01 Y:2008 01 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $14,145 $1,383 Implemented
OK0767 # 07 Y:2008 07 2008 INSTALL TIMERS AND/OR THERMOSTATS $46,431 $6,300 Implemented
OK0767 # 05 Y:2008 05 2008 $2,068 $200 Implemented
OK0753 # 01 Y:2007 01 2007 OPTIMIZE PLANT POWER FACTOR $49,649 $0 Implemented
OK0742 # 03 Y:2007 03 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,664 $275 Implemented
OK0742 # 05 Y:2007 05 2007 INSULATE BARE EQUIPMENT $2,516 $3,910 Implemented
OK0703 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,018 $22,540 Implemented
OK0703 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,596 $39,180 Implemented
OK0703 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,044 $25,020 Implemented
OK0703 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,204 $1,727 Implemented
OK0627 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,466 $9,056 Implemented
KU0519 # 05 Y:1999 05 1999 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,490 $5,000 Implemented
KU0519 # 07 Y:1999 07 1999 $84,340 $24,800 Implemented
KU0519 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,440 $860 Implemented