IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

865

matching recommendations
Reset
SIC 335 Nonferrous Rolling And Drawing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0271 # 06 Y:2008 06 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,337 $3,000 Implemented
LE0271 # 09 Y:2008 09 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,934 $1,000 Implemented
GT0848 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $340 $1,000 Implemented
GT0848 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,718 $3,250 Implemented
GT0848 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,088 $0 Implemented
MA0630 # 03 Y:2008 03 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,565 $2,000 Implemented
MA0630 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $639 $300 Implemented
MA0630 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $189 $1,300 Implemented
LL0288 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $36,904 $5,110 Implemented
LL0288 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,639 $840 Implemented
LL0288 # 04 Y:2008 04 2008 INSULATE BARE EQUIPMENT $3,002 $1,635 Implemented
BD0335 # 03 Y:2008 03 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $109,544 $73,511 Implemented
BD0335 # 04 Y:2008 04 2008 USE SYNTHETIC LUBRICANT $2,411 $501 Implemented
BD0335 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,080 $2 Implemented
NC0371 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $444 $100 Implemented
NC0371 # 03 Y:2008 03 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,277 $17,280 Implemented
NC0371 # 09 Y:2008 09 2008 INSULATE BARE EQUIPMENT $288 $485 Implemented
BD0334 # 01 Y:2007 01 2007 USE RADIANT HEATER FOR SPOT HEATING $242,313 $111,001 Implemented
BD0334 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,532 $3,690 Implemented
BD0334 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $3,999 $1,576 Implemented
BD0334 # 07 Y:2007 07 2007 USE SYNTHETIC LUBRICANT $3,966 $301 Implemented
BD0334 # 08 Y:2007 08 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,625 $24,551 Implemented
UD0766 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $78,420 $279,770 Implemented
UD0766 # 07 Y:2007 07 2007 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $40,000 $1,100 Implemented
UD0766 # 08 Y:2007 08 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,800 $20,000 Implemented