Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
318
matching recommendationsSIC | 3354 | Aluminum Extruded Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0226 # 01 Y:2001 | 01 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,373 | $0 | Implemented |
GT0715 # 02 Y:2001 | 02 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,380 | $0 | Implemented |
GT0715 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,725 | $28,875 | Implemented |
GT0715 # 07 Y:2001 | 07 | 2001 | USE LESS WASTEFUL PACKAGING | $1,754 | $0 | Implemented |
AS0293 # 01 Y:2001 | 01 | 2001 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $5,069 | $2,460 | Implemented |
AS0292 # 01 Y:2001 | 01 | 2001 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $2,245 | $540 | Implemented |
SD0250 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $44,752 | $600 | Implemented |
CO0473 # 01 Y:2000 | 01 | 2000 | IMPROVE COMBUSTION CONTROL CAPABILITY | $74,960 | $1,050 | Implemented |
CO0473 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,150 | $400 | Implemented |
CO0473 # 03 Y:2000 | 03 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,360 | $10,000 | Implemented |
CO0473 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,980 | $1,000 | Implemented |
CO0473 # 05 Y:2000 | 05 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,180 | $6,780 | Implemented |
CO0473 # 06 Y:2000 | 06 | 2000 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $1,260 | $500 | Implemented |
CO0473 # 07 Y:2000 | 07 | 2000 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $107,610 | $75,000 | Implemented |
CO0473 # 08 Y:2000 | 08 | 2000 | USE IN-PROCESS RECYCLING WHENEVER POSSIBLE | $39,460 | $10,000 | Implemented |
ND0361 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $695 | $100 | Implemented |
ND0361 # 05 Y:2000 | 05 | 2000 | DEVELOP A REPAIR/REPLACE POLICY | $4,112 | $41,893 | Implemented |
ND0361 # 06 Y:2000 | 06 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,329 | $400 | Implemented |
SD0256 # 01 Y:2000 | 01 | 2000 | INSTALL SKYLIGHTS | $18,038 | $27,000 | Implemented |
SD0256 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,703 | $7,230 | Implemented |
SD0256 # 05 Y:2000 | 05 | 2000 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $290,738 | $0 | Implemented |
GT0681 # 05 Y:1999 | 05 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $12,917 | $4,800 | Implemented |
UF0233 # 02 Y:1999 | 02 | 1999 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,008 | $750 | Implemented |
UF0233 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,649 | $320 | Implemented |
UF0233 # 05 Y:1999 | 05 | 1999 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $10,287 | $14,925 | Implemented |