IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,255

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0372 # 11 Y:2000 11 2000 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $315 $0 Implemented
SD0245 # 03 Y:2000 03 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,787 $2,500 Implemented
SD0245 # 07 Y:2000 07 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $515 $0 Implemented
UM0161 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,365 $450 Implemented
UM0161 # 03 Y:2000 03 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $48,437 $500 Implemented
SD0238 # 01 Y:2000 01 2000 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $21,910 $10,250 Implemented
SD0238 # 02 Y:2000 02 2000 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $13,294 $11,825 Implemented
SD0238 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $838 $1,880 Implemented
SD0238 # 05 Y:2000 05 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $25,314 $100,000 Implemented
AM0370 # 03 Y:2000 03 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $19,700 $74,740 Implemented
AM0370 # 04 Y:2000 04 2000 REDUCE OR ELIMINATE WASTE $17,500 $2,120 Implemented
AM0370 # 06 Y:2000 06 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,950 $500 Implemented
AM0370 # 07 Y:2000 07 2000 PAY BILLS ON TIME TO AVOID LATE FEES $6,870 $0 Implemented
AM0370 # 08 Y:2000 08 2000 $5,390 $0 Implemented
AM0370 # 12 Y:2000 12 2000 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT $675 $150 Implemented
AM0370 # 13 Y:2000 13 2000 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $105 $0 Implemented
SD0243 # 05 Y:2000 05 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,209 $7,872 Implemented
SD0243 # 06 Y:2000 06 2000 INSULATE BARE EQUIPMENT $4,293 $9,936 Implemented
SD0243 # 09 Y:2000 09 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,098 $500 Implemented
SD0242 # 01 Y:2000 01 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $14,399 $1,960 Implemented
SD0242 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,903 $0 Implemented
SD0242 # 07 Y:2000 07 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,533 $8,500 Implemented
WI0370 # 03 Y:2000 03 2000 REPLACE CLOTH RAGS WITH PAPER TOWELS $3,255 $0 Implemented
MA0459 # 02 Y:2000 02 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,064 $150 Implemented
MA0459 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $789 $150 Implemented