IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,269

matching recommendations
Reset
ARC 2.1 Combustion Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0647 # 10 Y:2024 10 2024 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $14,883 $5,765 n/a
UU0236 # 01 Y:2024 01 2024 REPLACE BOILER $208,300 $1,070,720 n/a
UA0281 # 07 Y:2023 07 2023 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,437 $26,750 n/a
SD0646 # 02 Y:2024 02 2024 ADJUST BURNERS FOR EFFICIENT OPERATION $16,626 $6,076 n/a
SD0646 # 03 Y:2024 03 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $503 $614 n/a
UC2316 # 07 Y:2023 07 2023 REPLACE BOILER $177,614 $423,535 n/a
UC2316 # 04 Y:2023 04 2023 INSTALL TURBULATORS $13,337 $10,920 n/a
UC2316 # 05 Y:2023 05 2023 REDUCE EXCESSIVE BOILER BLOWDOWN $2,801 $12,000 n/a
UC2316 # 06 Y:2023 06 2023 BURN A LESS EXPENSIVE GRADE OF FUEL $153,910 $207,578 n/a
AM0894 # 03 Y:2024 03 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $670 $790 n/a
MI0432 # 05 Y:2023 05 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,587 $1,360 n/a
AS0565 # 03 Y:2023 03 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $89,587 $918,750 n/a
MU0041 # 01 Y:2023 01 2023 INSTALL AUTOMATIC STACK DAMPER $4,161 $959 n/a
DL0231 # 08 Y:2024 08 2024 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $266,000 $385,800 n/a
DL0231 # 07 Y:2024 07 2024 IMPROVE COMBUSTION CONTROL CAPABILITY $211,766 $21,800 n/a
SF0610 # 03 Y:2024 03 2024 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $32,003 $15,909 n/a
WV0654 # 08 Y:2023 08 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,093 $1,113 n/a
WV0654 # 09 Y:2023 09 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $951 $330 n/a
IP0178 # 04 Y:2023 04 2023 REPLACE BOILER $5,185 $20,824 n/a
SD0643 # 06 Y:2024 06 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $6,190 $4,926 n/a
SD0643 # 05 Y:2024 05 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,058 $4,196 n/a
OR0782 # 02 Y:2023 02 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $34,701 $316,866 n/a
LS2023 # 07 Y:2023 07 2023 IMPROVE COMBUSTION CONTROL CAPABILITY $17,898 $60,000 n/a
UU0230 # 06 Y:2023 06 2023 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $7,985 $11,730 n/a
CI0023 # 03 Y:2023 03 2023 REPLACE BOILER $13,894 $30,000 n/a