IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,766

matching recommendations
Reset
ARC 2.2 Thermal Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0511 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $824 $1,526 Implemented
SD0556 # 06 Y:2017 06 2017 COVER OPEN TANKS $18,591 $10,800 Implemented
MZ0240 # 01 Y:2017 01 2017 RECOVER WASTE HEAT FROM EQUIPMENT $7,020 $6,000 Implemented
NL0013 # 02 Y:2017 02 2017 INSULATE BARE EQUIPMENT $6,000 $16,000 Implemented
CL1704 # 02 Y:2017 02 2017 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $11,470 $15,000 Implemented
LE0444 # 05 Y:2017 05 2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $110,990 $170,000 Implemented
UD0975 # 03 Y:2017 03 2017 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $17,029 $68 Implemented
IP0091 # 08 Y:2017 08 2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $10,019 $47,182 Implemented
AM0738 # 04 Y:2017 04 2017 INCREASE AMOUNT OF CONDENSATE RETURNED $10,870 $19,400 Implemented
AM0738 # 05 Y:2017 05 2017 INSULATE BARE EQUIPMENT $10,990 $9,760 Implemented
IP0090 # 03 Y:2017 03 2017 COVER OPEN TANKS $12,129 $1,104 Implemented
MI0322 # 02 Y:2017 02 2017 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $314,391 $1,004,370 Implemented
MI0322 # 03 Y:2017 03 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $171,697 $338,000 Implemented
IP0089 # 10 Y:2017 10 2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $1,079 $5,047 Implemented
BS0106 # 03 Y:2017 03 2017 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,159 $710 Implemented
MI0321 # 01 Y:2017 01 2017 USE OPTIMUM THICKNESS INSULATION $17,954 $21,920 Implemented
MI0321 # 09 Y:2017 09 2017 INSULATE BARE EQUIPMENT $1,612 $1,914 Implemented
SF0507 # 02 Y:2017 02 2017 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $7,895 $560 Implemented
SF0507 # 03 Y:2017 03 2017 REPAIR AND ELIMINATE STEAM LEAKS $1,567 $156 Implemented
SF0507 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $8,398 $3,902 Implemented
SF0507 # 07 Y:2017 07 2017 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $54,833 $312,470 Implemented
OR0688 # 01 Y:2017 01 2017 RECOVER WASTE HEAT FROM EQUIPMENT $3,431 $448 Implemented
MZ0239 # 04 Y:2017 04 2017 RECOVER WASTE HEAT FROM EQUIPMENT $3,933 $1,539 Implemented
WM0110 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $38,561 $90,000 Implemented
SF0506 # 01 Y:2017 01 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,307 $0 Implemented