IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,006

matching recommendations
Reset
ARC 2.2 Thermal Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0300 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $18,281 $13,000 n/a
CM1021 # 02 Y:2023 02 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $2,426 $981 n/a
CM1021 # 06 Y:2023 06 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $34,069 $800 n/a
UU0227 # 01 Y:2023 01 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $14,399 $40,790 Not Implemented
UC2310 # 09 Y:2023 09 2023 RECOVER WASTE HEAT FROM EQUIPMENT $1,865 $5,326 n/a
AM0887 # 03 Y:2023 03 2023 REPLACE AIR CURTAIN DOORS WITH SOLID DOORS $3,790 $8,650 Not Implemented
CI0017 # 08 Y:2023 08 2023 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,591 $5,000 n/a
OR0773 # 01 Y:2023 01 2023 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $5,439 $1,278 Implemented
OR0773 # 02 Y:2023 02 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $1,051 $797 Implemented
OR0773 # 03 Y:2023 03 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,507 $13,124 Not Implemented
LE0553 # 01 Y:2023 01 2023 INSULATE BARE EQUIPMENT $547 $270 n/a
LE0553 # 02 Y:2023 02 2023 INSULATE BARE EQUIPMENT $561 $416 n/a
LE0553 # 04 Y:2023 04 2023 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,974 $40,000 n/a
IC0288 # 06 Y:2023 06 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $592 $496 Implemented
DL0225 # 06 Y:2023 06 2023 INSULATE BARE EQUIPMENT $4,181 $6,480 Not Implemented
DL0225 # 08 Y:2023 08 2023 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $9,068 $28,750 Implemented
DL0225 # 09 Y:2023 09 2023 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $18,229 $60,000 Not Implemented
TT0299 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $2,097 $30 n/a
NL0086 # 01 Y:2023 01 2023 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $48,136 $100,000 Not Implemented
NL0086 # 02 Y:2023 02 2023 INSULATE BARE EQUIPMENT $6,202 $6,211 Implemented
LS2314 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $3,222 $660 Not Implemented
UU0233 # 02 Y:2023 02 2023 RECOVER WASTE HEAT FROM EQUIPMENT $2,200 $255 Not Implemented
UC2309 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $5,473 $22,421 Not Implemented
CM1020 # 05 Y:2023 05 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $1,748 $0 n/a
UF0600 # 05 Y:2023 05 2023 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $1,132 $1,440 Implemented