IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,022

matching recommendations
Reset
ARC 2.2 Thermal Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0693 # 03 Y:2012 03 2012 REPAIR AND ELIMINATE STEAM LEAKS $9,000 $4,200 Implemented
MA0693 # 07 Y:2012 07 2012 INSULATE BARE EQUIPMENT $373 $600 Not Implemented
MA0694 # 03 Y:2012 03 2012 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $5,619 $0 Implemented
MA0694 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $3,042 $665 Not Implemented
MA0694 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $2,300 $16,608 Implemented
OR0581 # 04 Y:2012 04 2012 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $36,155 $7,334 Not Implemented
OR0581 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $7,488 $6,761 Not Implemented
WV0448 # 04 Y:2012 04 2012 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $3,243 $14,500 Not Implemented
WV0447 # 09 Y:2012 09 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,404 $3,320 Not Implemented
UA0081 # 03 Y:2012 03 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $24,682 $6,975 Not Implemented
UA0080 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $15,904 $7,093 Not Implemented
UM0400 # 02 Y:2012 02 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,755 $17,500 Not Implemented
UM0400 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $3,660 $4,000 Not Implemented
IA0479 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,014 $250 Not Implemented
MA0692 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $3,685 $2,500 Not Implemented
MA0692 # 08 Y:2012 08 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,013 $3,000 Not Implemented
MS0391 # 01 Y:2012 01 2012 REPAIR AND ELIMINATE STEAM LEAKS $15,275 $606 Not Implemented
MZ0087 # 05 Y:2012 05 2012 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $41,961 $100,000 Not Implemented
TT0088 # 01 Y:2012 01 2012 MODERATE COOLING TOWER OUTLET TEMPERATURE $192 $25 Not Implemented
TT0088 # 10 Y:2012 10 2012 USE HEAT EXCHANGE FLUIDS INSTEAD OF STEAM IN PIPELINE TRACING SYSTEMS $19,167 $47,935 Not Implemented
SD0450 # 01 Y:2012 01 2012 USE MINIMUM STEAM OPERATING PRESSURE $8,111 $200 Not Implemented
SD0450 # 05 Y:2012 05 2012 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $8,500 $25,000 Not Implemented
UD0854 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,511 $1,500 Not Implemented
DL0086 # 02 Y:2012 02 2012 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $2,479 $500 Implemented
DL0086 # 03 Y:2012 03 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,390 $280 Not Implemented