IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,009

matching recommendations
Reset
ARC 2.2 Thermal Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0481 # 08 Y:2019 08 2019 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,376 $10,000 Not Implemented
LE0481 # 09 Y:2019 09 2019 RECOVER WASTE HEAT FROM EQUIPMENT $390 $1,850 Implemented
WV0584 # 01 Y:2019 01 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $534,947 $542,300 Not Implemented
LE0481 # 03 Y:2019 03 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $42,460 $57,500 Not Implemented
UU0154 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $10,215 $3,044 Implemented
UK1908 # 16 Y:2019 16 2019 INSULATE BARE EQUIPMENT $13,639 $18,226 Not Implemented
UK1908 # 11 Y:2019 11 2019 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $13,831 $5,000 Not Implemented
UK1908 # 18 Y:2019 18 2019 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $21,879 $28,230 Not Implemented
UK1908 # 14 Y:2019 14 2019 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,671 $2,684 Not Implemented
UK1908 # 12 Y:2019 12 2019 CLEAN CONDENSER TUBES $15,832 $7,858 Implemented
BS0126 # 04 Y:2019 04 2019 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $16,406 $13,000 Not Implemented
UK1908 # 17 Y:2019 17 2019 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $1,430 $0 Implemented
NC0638 # 01 Y:2019 01 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,797 $85,000 Not Implemented
NC0638 # 03 Y:2019 03 2019 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $6,164 $6,700 Not Implemented
NC0638 # 02 Y:2019 02 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $5,807 $3,600 Not Implemented
TT0226 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $31,634 $2,200 Not Implemented
AS0477 # 02 Y:2019 02 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $64,747 $120,000 Implemented
MZ0278 # 08 Y:2019 08 2019 RECOVER WASTE HEAT FROM EQUIPMENT $35,571 $11,900 Not Implemented
MZ0278 # 01 Y:2019 01 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $902,475 $6,762,500 Implemented
MZ0278 # 06 Y:2019 06 2019 INSULATE BARE EQUIPMENT $45,917 $2,907 Implemented
GT0929 # 05 Y:2019 05 2019 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,348 $8,500 Not Implemented
UD1000 # 03 Y:2019 03 2019 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,599 $0 Implemented
BS0125 # 11 Y:2019 11 2019 AVOID FROST FORMATION ON EVAPORATORS $2,258 $618 Not Implemented
UD1000 # 07 Y:2019 07 2019 RECOVER WASTE HEAT FROM EQUIPMENT $24,374 $48,748 Not Implemented
UD1000 # 04 Y:2019 04 2019 USE OPTIMUM THICKNESS INSULATION $2,318 $290 Not Implemented