Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
288
matching recommendationsARC | 2.2 | Thermal Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TR0042 # 03 Y:2022 | 03 | 2022 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $18,544 | $6,243 | Implemented |
NL0076 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $24,481 | $25,000 | Not Implemented |
CM1015 # 05 Y:2022 | 05 | 2022 | INSTALL / REPAIR INSULATION ON STEAM LINES | $578 | $1,310 | Not Implemented |
CC0012 # 07 Y:2022 | 07 | 2022 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $47,241 | $125,000 | n/a |
CC0012 # 05 Y:2022 | 05 | 2022 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $3,233 | $0 | n/a |
UA0268 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,098 | $8,397 | Not Implemented |
CM1011 # 03 Y:2022 | 03 | 2022 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $696 | $6,720 | Not Implemented |
MI0417 # 05 Y:2022 | 05 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $9,078 | $12,846 | Not Implemented |
CM1011 # 01 Y:2022 | 01 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,460 | $8,880 | Not Implemented |
IP0167 # 06 Y:2022 | 06 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,236 | $2,330 | Not Implemented |
CI0006 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $22,728 | $6,000 | Not Implemented |
UL2217 # 08 Y:2022 | 08 | 2022 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $6,524 | $25,900 | Not Implemented |
UL2217 # 06 Y:2022 | 06 | 2022 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,602 | $50,000 | Implemented |
CC0011 # 05 Y:2022 | 05 | 2022 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $10,252 | $50,000 | n/a |
UL2216 # 11 Y:2022 | 11 | 2022 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,497 | $40,000 | Not Implemented |
UA0266 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,514 | $8,397 | Not Implemented |
SU0528 # 04 Y:2022 | 04 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,434 | $414 | Not Implemented |
IP0166 # 08 Y:2022 | 08 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $704 | $1,279 | Not Implemented |
IP0166 # 03 Y:2022 | 03 | 2022 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $9,132 | $0 | Not Implemented |
IP0166 # 02 Y:2022 | 02 | 2022 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $4,102 | $0 | Not Implemented |
IP0166 # 01 Y:2022 | 01 | 2022 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $12,766 | $0 | Not Implemented |
CM1009 # 02 Y:2022 | 02 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $13,200 | $201,300 | Implemented |
IP0164 # 06 Y:2022 | 06 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $972 | $1,279 | Implemented |
SU0527 # 08 Y:2022 | 08 | 2022 | INSULATE BARE EQUIPMENT | $18,264 | $9,030 | Not Implemented |
UF0587 # 02 Y:2022 | 02 | 2022 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,027 | $20,000 | Not Implemented |