Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,766
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0782 # 04 Y:2017 | 04 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $277 | $100 | Implemented |
MA0781 # 04 Y:2017 | 04 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,734 | $2,724 | Implemented |
MA0781 # 05 Y:2017 | 05 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $285 | $215 | Implemented |
MA0779 # 04 Y:2017 | 04 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,249 | $100 | Implemented |
MA0779 # 06 Y:2017 | 06 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $213 | $200 | Implemented |
MA0778 # 02 Y:2017 | 02 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $17,208 | $14,500 | Implemented |
MA0778 # 03 Y:2017 | 03 | 2017 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $17,175 | $73,000 | Implemented |
MA0778 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,137 | $11,649 | Implemented |
MA0775 # 02 Y:2017 | 02 | 2017 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $20,697 | $100 | Implemented |
MA0776 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,365 | $15,725 | Implemented |
MA0776 # 03 Y:2017 | 03 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $973 | $301 | Implemented |
MA0774 # 01 Y:2017 | 01 | 2017 | USE SOLAR HEAT FOR HEAT | $58,825 | $627,522 | Implemented |
MA0774 # 04 Y:2017 | 04 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,868 | $652 | Implemented |
MA0774 # 05 Y:2017 | 05 | 2017 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $2,908 | $1,775 | Implemented |
MA0773 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,580 | $14,050 | Implemented |
MA0773 # 03 Y:2017 | 03 | 2017 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $5,593 | $10,625 | Implemented |
MA0773 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,500 | $1,000 | Implemented |
MA0772 # 02 Y:2017 | 02 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,550 | $7,200 | Implemented |
MA0772 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $551 | $300 | Implemented |
MA0772 # 06 Y:2017 | 06 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $499 | $20 | Implemented |
MA0771 # 01 Y:2017 | 01 | 2017 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $13,141 | $1,000 | Implemented |
MA0771 # 03 Y:2017 | 03 | 2017 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $527 | $2,116 | Implemented |
MA0770 # 03 Y:2017 | 03 | 2017 | OPTIMIZE PLANT POWER FACTOR | $1,809 | $2,784 | Implemented |
MA0770 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $124 | $100 | Implemented |
MA0769 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $90,487 | $39,330 | Implemented |