IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,240

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0640 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,140 $2,765 Implemented
TN0640 # 03 Y:1998 03 1998 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $7,440 $400 Implemented
TN0640 # 02 Y:1998 02 1998 $24,975 $27,000 Implemented
TN0640 # 01 Y:1998 01 1998 $135,200 $72,120 Implemented
TN0635 # 04 Y:1998 04 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $9,760 $3,580 Implemented
TN0635 # 02 Y:1998 02 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $39,020 $13,600 Implemented
TN0637 # 07 Y:1998 07 1998 RECYCLE NONFERROUS DUST $2,880 $0 Implemented
TN0637 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,860 $1,000 Implemented
TN0637 # 03 Y:1998 03 1998 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $48,770 $9,300 Implemented
TN0637 # 02 Y:1998 02 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $248,625 $0 Implemented
TN0631 # 05 Y:1998 05 1998 INSTALL TIMERS AND/OR THERMOSTATS $5,830 $7,750 Implemented
TN0630 # 03 Y:1998 03 1998 $10,800 $5,900 Implemented
TN0629 # 04 Y:1998 04 1998 $21,285 $25,800 Implemented
TN0629 # 01 Y:1998 01 1998 REDUCE SCRAP PRODUCTION $62,560 $5,700 Implemented
TN0629 # 07 Y:1998 07 1998 REDESIGN PROCESS $2,675 $1,100 Implemented
TN0629 # 09 Y:1998 09 1998 METER WASTE WATER $1,210 $2,980 Implemented
TN0628 # 02 Y:1998 02 1998 $24,400 $0 Implemented
TN0628 # 04 Y:1998 04 1998 RECOVER AND REUSE WASTE MATERIAL $5,910 $16,880 Implemented
TN0628 # 05 Y:1998 05 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,815 $5,600 Implemented
TN0628 # 08 Y:1998 08 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,560 $2,170 Implemented
TN0628 # 06 Y:1998 06 1998 $3,690 $10,500 Implemented
TN0628 # 09 Y:1998 09 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,950 $0 Implemented
TN0626 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,860 $4,550 Implemented
TN0626 # 04 Y:1998 04 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,535 $0 Implemented
TN0624 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,690 $0 Implemented