Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,245
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0468 # 05 Y:2016 | 05 | 2016 | INSULATE BARE EQUIPMENT | $1,588 | $1,500 | Implemented |
UM0468 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,125 | $43,167 | Implemented |
UM0468 # 04 Y:2016 | 04 | 2016 | INSULATE BARE EQUIPMENT | $3,084 | $2,000 | Implemented |
UM0466 # 02 Y:2016 | 02 | 2016 | INSULATE BARE EQUIPMENT | $1,801 | $1,000 | Implemented |
UM0466 # 05 Y:2016 | 05 | 2016 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $387 | $400 | Implemented |
UM0466 # 03 Y:2016 | 03 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,784 | $1,000 | Implemented |
UM0464 # 04 Y:2016 | 04 | 2016 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $736 | $150 | Implemented |
UM0464 # 05 Y:2016 | 05 | 2016 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,107 | $7,900 | Implemented |
UM0464 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,786 | $3,794 | Implemented |
UM0463 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $150,724 | $565,274 | Implemented |
UM0461 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,057 | $2,000 | Implemented |
UM0461 # 04 Y:2015 | 04 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,928 | $1,000 | Implemented |
UM0460 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,526 | $161,000 | Implemented |
UM0460 # 01 Y:2015 | 01 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,160 | $1,100 | Implemented |
UM0460 # 05 Y:2015 | 05 | 2015 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $5,072 | $4,000 | Implemented |
UM0459 # 03 Y:2015 | 03 | 2015 | ADJUST BURNERS FOR EFFICIENT OPERATION | $299,710 | $30,000 | Implemented |
UM0458 # 01 Y:2015 | 01 | 2015 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $7,036 | $0 | Implemented |
UM0457 # 02 Y:2015 | 02 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $162,816 | $1,000 | Implemented |
UM0456 # 02 Y:2015 | 02 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $21,808 | $17,500 | Implemented |
UM0456 # 01 Y:2015 | 01 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,025 | $1,500 | Implemented |
UM0456 # 04 Y:2015 | 04 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $22,704 | $10,000 | Implemented |
UM0455 # 05 Y:2015 | 05 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,338 | $2,500 | Implemented |
UM0455 # 03 Y:2015 | 03 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,898 | $500 | Implemented |
UM0455 # 04 Y:2015 | 04 | 2015 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $6,274 | $7,300 | Implemented |
UM0454 # 03 Y:2015 | 03 | 2015 | CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES | $2,130 | $1,710 | Implemented |