IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,245

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0468 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $1,588 $1,500 Implemented
UM0468 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,125 $43,167 Implemented
UM0468 # 04 Y:2016 04 2016 INSULATE BARE EQUIPMENT $3,084 $2,000 Implemented
UM0466 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $1,801 $1,000 Implemented
UM0466 # 05 Y:2016 05 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $387 $400 Implemented
UM0466 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,784 $1,000 Implemented
UM0464 # 04 Y:2016 04 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $736 $150 Implemented
UM0464 # 05 Y:2016 05 2016 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,107 $7,900 Implemented
UM0464 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,786 $3,794 Implemented
UM0463 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $150,724 $565,274 Implemented
UM0461 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,057 $2,000 Implemented
UM0461 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,928 $1,000 Implemented
UM0460 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,526 $161,000 Implemented
UM0460 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,160 $1,100 Implemented
UM0460 # 05 Y:2015 05 2015 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,072 $4,000 Implemented
UM0459 # 03 Y:2015 03 2015 ADJUST BURNERS FOR EFFICIENT OPERATION $299,710 $30,000 Implemented
UM0458 # 01 Y:2015 01 2015 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $7,036 $0 Implemented
UM0457 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $162,816 $1,000 Implemented
UM0456 # 02 Y:2015 02 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $21,808 $17,500 Implemented
UM0456 # 01 Y:2015 01 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,025 $1,500 Implemented
UM0456 # 04 Y:2015 04 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,704 $10,000 Implemented
UM0455 # 05 Y:2015 05 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,338 $2,500 Implemented
UM0455 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,898 $500 Implemented
UM0455 # 04 Y:2015 04 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,274 $7,300 Implemented
UM0454 # 03 Y:2015 03 2015 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $2,130 $1,710 Implemented