IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,629

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0345 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $862 $6,560 Implemented
ND0345 # 05 Y:2000 05 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $913 $0 Implemented
ND0345 # 06 Y:2000 06 2000 ELIMINATE/REDUCE REDUNDANT INSPECTIONS $134 $0 Implemented
UM0156 # 01 Y:2000 01 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $428 $500 Implemented
UM0156 # 02 Y:2000 02 2000 DISCONNECT BALLASTS $1,786 $0 Implemented
UM0156 # 05 Y:2000 05 2000 REPAIR OR REPLACE STEAM TRAPS $9,420 $880 Implemented
UM0156 # 06 Y:2000 06 2000 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $7,640 $6,500 Implemented
UM0155 # 01 Y:2000 01 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $575 $500 Implemented
UM0155 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,279 $300 Implemented
UM0155 # 03 Y:2000 03 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $664 $309 Implemented
UM0155 # 05 Y:2000 05 2000 RECOVER AND REUSE COOLING WATER $31,455 $21,257 Implemented
UM0154 # 01 Y:2000 01 2000 DISCONNECT BALLASTS $2,608 $880 Implemented
UM0154 # 04 Y:2000 04 2000 REDUCE VENTILATION AIR $18,794 $0 Implemented
UM0154 # 05 Y:2000 05 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $9,360 $0 Implemented
UM0153 # 04 Y:2000 04 2000 RECOVER AND REUSE WASTE MATERIAL $17,500 $1,000 Implemented
UM0152 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $188 $200 Implemented
UM0152 # 03 Y:2000 03 2000 USE LESS WASTEFUL PACKAGING $147,272 $0 Implemented
UM0152 # 04 Y:2000 04 2000 RECOVER AND REUSE COOLING WATER $1,649 $3,826 Implemented
UM0151 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $533 $542 Implemented
UM0151 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,156 $1,000 Implemented
UM0151 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,404 $1,425 Implemented
UM0151 # 04 Y:1999 04 1999 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $5,903 $11,000 Implemented
UM0148 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,826 $2,464 Implemented
UM0148 # 04 Y:1999 04 1999 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $12,311 $40,000 Implemented
UM0145 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,720 $300 Implemented