IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
SIC 249 Miscellaneous Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0767 # 03 Y:2023 03 2023 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $300,390 $200,000 Implemented
OR0767 # 02 Y:2023 02 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $172,773 $37,200 Implemented
OR0679 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $20,472 $0 Implemented
OR0679 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,613 $47,385 Implemented
OR0679 # 04 Y:2016 04 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $31,513 $47,575 Implemented
OR0679 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $74,285 $6,200 Implemented
OR0676 # 06 Y:2016 06 2016 INSULATE BARE EQUIPMENT $2,884 $6,584 Implemented
OR0676 # 05 Y:2016 05 2016 ADD AREA LIGHTING SWITCHES $1,356 $1,062 Implemented
OR0676 # 04 Y:2016 04 2016 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $11,774 $7,200 Implemented
OR0676 # 03 Y:2016 03 2016 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $216,607 $80,000 Implemented
OR0664 # 03 Y:2016 03 2016 INSTALL SPECTRAL REFLECTORS / DELAMP $12,507 $32,393 Implemented
OR0657 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,205 $50,205 Implemented
OR0640 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,092 $12,092 Implemented
OR0640 # 01 Y:2014 01 2014 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $131,605 $242,261 Implemented
OR0616 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,132 $6,100 Implemented
OR0616 # 01 Y:2013 01 2013 INSTALL SENSORS TO DETECT DEFECTS $145,630 $200 Implemented
OR0616 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $645 $750 Implemented
OR0575 # 04 Y:2011 04 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $3,389 $948 Implemented
OR0575 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,748 $3,023 Implemented
OR0572 # 07 Y:2011 07 2011 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,280 $500 Implemented
OR0572 # 04 Y:2011 04 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $2,350 $4,320 Implemented
OR0572 # 01 Y:2011 01 2011 UPGRADE CONTROLS ON COMPRESSORS $6,860 $3,642 Implemented
OR0549 # 04 Y:2009 04 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,682 $0 Implemented
OR0549 # 05 Y:2009 05 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $8,800 $3,500 Implemented
OR0530 # 06 Y:2008 06 2008 General $4,900 $500 Implemented