IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

134

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0361 # 07 Y:2007 07 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $1,150 $1,200 Implemented
NC0361 # 08 Y:2007 08 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $452 $500 Implemented
NC0321 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,185 $5,475 Implemented
NC0321 # 03 Y:2005 03 2005 ADJUST BURNERS FOR EFFICIENT OPERATION $19,559 $3,000 Implemented
NC0321 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,543 $1,070 Implemented
NC0287 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $615 $100 Implemented
NC0287 # 04 Y:2004 04 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,732 $700 Implemented
NC0287 # 05 Y:2004 05 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,915 $750 Implemented
NC0283 # 02 Y:2004 02 2004 RECOVER AND REUSE COOLING WATER $7,112 $6,000 Implemented
NC0283 # 03 Y:2004 03 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,469 $1,200 Implemented
NC0283 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $1,077 $356 Implemented
NC0214 # 01 Y:2001 01 2001 USE PHOTOCELL CONTROLS $2,595 $2,000 Implemented
NC0214 # 03 Y:2001 03 2001 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $158,850 $100,000 Implemented
NC0214 # 06 Y:2001 06 2001 $8,000 $500 Implemented
NC0214 # 07 Y:2001 07 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $65,115 $86,000 Implemented
NC0219 # 02 Y:2001 02 2001 ADJUST BURNERS FOR EFFICIENT OPERATION $33,380 $800 Implemented
NC0215 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $93 $100 Implemented
NC0211 # 01 Y:2001 01 2001 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $23,426 $20,000 Implemented
NC0211 # 02 Y:2001 02 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,719 $800 Implemented
NC0211 # 03 Y:2001 03 2001 USE MINIMUM STEAM OPERATING PRESSURE $2,014 $250 Implemented
NC0211 # 04 Y:2001 04 2001 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,453 $6,000 Implemented
NC0211 # 06 Y:2001 06 2001 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,631 $0 Implemented
NC0189 # 01 Y:2000 01 2000 ADJUST BURNERS FOR EFFICIENT OPERATION $1,081 $800 Implemented
NC0143 # 01 Y:1998 01 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,467 $700 Implemented
NC0133 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,797 $7,696 Implemented