IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,376

matching recommendations
Reset
SIC 371 Motor Vehicles And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0289 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,383 $578 Implemented
SU0289 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $1,653 $1,236 Implemented
SU0289 # 07 Y:2010 07 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $528 $714 Implemented
UA0041 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $55,100 $119,700 Implemented
UA0041 # 03 Y:2010 03 2010 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $5,320 $2,520 Implemented
UA0041 # 04 Y:2010 04 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $216,130 $0 Implemented
UA0041 # 05 Y:2010 05 2010 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $76,495 $0 Implemented
UA0041 # 07 Y:2010 07 2010 INSULATE BARE EQUIPMENT $1,020 $2,450 Implemented
UA0041 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,050 $2 Implemented
UA0041 # 11 Y:2010 11 2010 INSTALL TIMERS AND/OR THERMOSTATS $5,765 $675 Implemented
GT0868 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,232 $60,000 Implemented
GT0868 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,204 $4,676 Implemented
GT0868 # 06 Y:2009 06 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,368 $4,750 Implemented
TT0036 # 02 Y:2009 02 2009 DISCONNECT BALLASTS $3,640 $0 Implemented
TT0036 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,980 $2,000 Implemented
TT0036 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,660 $800 Implemented
UM0353 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $186,999 $237,500 Implemented
UM0353 # 02 Y:2009 02 2009 RECOVER WASTE HEAT FROM EQUIPMENT $26,834 $500 Implemented
UM0353 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $22,368 $3,000 Implemented
UM0353 # 06 Y:2009 06 2009 USE OPTIMUM TEMPERATURE $13,085 $200 Implemented
UM0353 # 08 Y:2009 08 2009 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,526 $1,500 Implemented
MS0342 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,269 $61,142 Implemented
MS0342 # 02 Y:2009 02 2009 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $8,753 $0 Implemented
MS0342 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,780 $462 Implemented
MS0342 # 04 Y:2009 04 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,113 $0 Implemented