IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,021

matching recommendations
Reset
ARC 2.2 Thermal Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0457 # 10 Y:2012 10 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $2,722 $871 Implemented
SD0457 # 11 Y:2012 11 2012 REPAIR AND ELIMINATE STEAM LEAKS $2,233 $200 Implemented
SD0457 # 13 Y:2012 13 2012 USE MINIMUM STEAM OPERATING PRESSURE $781 $200 Not Implemented
NC0470 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $35,967 $85,750 Not Implemented
NC0470 # 07 Y:2012 07 2012 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $12,321 $36,400 Not Implemented
MZ0098 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $57,632 $23,700 Implemented
MZ0098 # 04 Y:2012 04 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $9,018 $250 Implemented
AM0621 # 01 Y:2012 01 2012 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $23,375 $50,000 Not Implemented
UD0867 # 09 Y:2012 09 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $23,710 $0 Not Implemented
UD0867 # 10 Y:2012 10 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,097 $0 Implemented
UK1213 # 12 Y:2012 12 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,563 $4,550 Implemented
WV0458 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $63,289 $91,080 Not Implemented
WV0458 # 07 Y:2012 07 2012 INSULATE BARE EQUIPMENT $1,138 $573 Implemented
WV0457 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $2,539 $5,407 Implemented
WV0457 # 09 Y:2012 09 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,194 $150 Not Implemented
WV0457 # 10 Y:2012 10 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,022 $950 Not Implemented
TT0098 # 05 Y:2012 05 2012 REPAIR AND ELIMINATE STEAM LEAKS $7,381 $980 Implemented
OK0832 # 07 Y:2012 07 2012 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $6,074 $29,738 Not Implemented
OR0594 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $2,867 $2,708 Not Implemented
NC0464 # 04 Y:2012 04 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $42,271 $58,000 Not Implemented
LE0350 # 10 Y:2012 10 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $21 $0 Implemented
LE0350 # 11 Y:2012 11 2012 REPAIR OR REPLACE STEAM TRAPS $5,076 $1,275 Implemented
LE0350 # 14 Y:2012 14 2012 LOWER OPERATING PRESSURE OF CONDENSER (STEAM) $57 $0 Implemented
DL0093 # 09 Y:2012 09 2012 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $480 $425 Not Implemented
OR0593 # 03 Y:2012 03 2012 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $2,514 $900 Not Implemented