IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

19,997

matching recommendations
Reset
ARC 2.2 Thermal Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0369 # 03 Y:1996 03 1996 INSULATE BARE EQUIPMENT $4,040 $8,200 Not Implemented
ME0196 # 07 Y:1996 07 1996 INSULATE BARE EQUIPMENT $236 $126 Implemented
NV0058 # 01 Y:1996 01 1996 INSULATE BARE EQUIPMENT $3,660 $1,960 Not Implemented
MA0366 # 08 Y:1996 08 1996 UTILIZE A LESS EXPENSIVE COOLING METHOD $435 $250 Not Implemented
MA0366 # 04 Y:1996 04 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,919 $9,000 Not Implemented
WI0274 # 06 Y:1996 06 1996 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $748 $1,000 Implemented
MA0366 # 01 Y:1996 01 1996 RECOVER WASTE HEAT FROM EQUIPMENT $1,638 $0 Not Implemented
OK0501 # 03 Y:1996 03 1996 USE MINIMUM STEAM OPERATING PRESSURE $3,659 $0 Implemented
OK0502 # 05 Y:1996 05 1996 USE MINIMUM STEAM OPERATING PRESSURE $3,651 $0 Implemented
TN0591 # 04 Y:1996 04 1996 RECOVER WASTE HEAT FROM EQUIPMENT $777 $2,520 Implemented
AS0182 # 06 Y:1996 06 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $1,812 $0 Not Implemented
AS0182 # 07 Y:1996 07 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $23,483 $35,000 Implemented
UF0156 # 05 Y:1996 05 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,922 $6,000 Not Implemented
TN0590 # 03 Y:1996 03 1996 RECOVER WASTE HEAT FROM EQUIPMENT $2,321 $8,150 Implemented
SD0155 # 03 Y:1996 03 1996 RECOVER WASTE HEAT FROM EQUIPMENT $1,872 $1,127 Not Implemented
SD0155 # 02 Y:1996 02 1996 COVER OPEN TANKS $254 $364 Implemented
SD0155 # 05 Y:1996 05 1996 INSULATE BARE EQUIPMENT $1,165 $158 Implemented
SD0155 # 04 Y:1996 04 1996 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $1,401 $1,127 Not Implemented
NC0092 # 06 Y:1996 06 1996 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $5,891 $50 Implemented
NC0092 # 08 Y:1996 08 1996 USE OPTIMUM THICKNESS INSULATION $164 $240 Implemented
NC0091 # 03 Y:1996 03 1996 USE OPTIMUM THICKNESS INSULATION $368 $195 Not Implemented
NV0063 # 08 Y:1996 08 1996 USE OPTIMUM THICKNESS INSULATION $9,970 $2,000 Implemented
NV0063 # 09 Y:1996 09 1996 USE OPTIMUM THICKNESS INSULATION $4,848 $6,210 Implemented
OD0062 # 02 Y:1996 02 1996 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,584 $3,850 Not Implemented
NC0091 # 02 Y:1996 02 1996 INSULATE BARE EQUIPMENT $946 $1,155 Implemented