Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
535
matching recommendationsARC | 2.2 | Thermal Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0925 # 08 Y:2015 | 08 | 2015 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,748 | $9,360 | Not Implemented |
MA0753 # 05 Y:2015 | 05 | 2015 | INSULATE BARE EQUIPMENT | $1,226 | $1,400 | Implemented |
MZ0205 # 01 Y:2015 | 01 | 2015 | INSULATE BARE EQUIPMENT | $771 | $1,050 | Not Implemented |
SU0402 # 03 Y:2015 | 03 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,073 | $600 | Implemented |
WM0079 # 06 Y:2015 | 06 | 2015 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $1,982 | $198 | Not Implemented |
NC0558 # 01 Y:2015 | 01 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $28,923 | $17,820 | Not Implemented |
NC0558 # 03 Y:2015 | 03 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $16,078 | $5,000 | Implemented |
IP0055 # 04 Y:2015 | 04 | 2015 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,413 | $3 | Not Implemented |
SU0401 # 08 Y:2015 | 08 | 2015 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $9,780 | $49,000 | Not Implemented |
BD0469 # 07 Y:2015 | 07 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $591 | $1,000 | Not Implemented |
BS0068 # 02 Y:2015 | 02 | 2015 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $1,272 | $5,853 | Not Implemented |
MI0289 # 13 Y:2015 | 13 | 2015 | INSULATE BARE EQUIPMENT | $302 | $160 | Implemented |
BS0068 # 01 Y:2015 | 01 | 2015 | USE OPTIMUM THICKNESS INSULATION | $70 | $51 | Not Implemented |
BS0068 # 04 Y:2015 | 04 | 2015 | USE OPTIMUM THICKNESS INSULATION | $29 | $100 | Not Implemented |
MZ0193 # 03 Y:2015 | 03 | 2015 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $62,777 | $37,500 | Implemented |
DL0154 # 01 Y:2015 | 01 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,950 | $2,280 | Implemented |
SU0399 # 05 Y:2015 | 05 | 2015 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $8,686 | $33,817 | Not Implemented |
BD0467 # 10 Y:2015 | 10 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $62 | $110 | Not Implemented |
MI0288 # 07 Y:2015 | 07 | 2015 | USE OPTIMUM THICKNESS INSULATION | $5,040 | $1,810 | Not Implemented |
UD0938 # 05 Y:2015 | 05 | 2015 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $29,938 | $3,000 | Not Implemented |
UA0151 # 01 Y:2015 | 01 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $107,877 | $42,000 | Implemented |
WM0078 # 06 Y:2015 | 06 | 2015 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,749 | $8,000 | Not Implemented |
UA0151 # 03 Y:2015 | 03 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $182,046 | $500,000 | Not Implemented |
NC0557 # 02 Y:2015 | 02 | 2015 | REPAIR AND ELIMINATE STEAM LEAKS | $4,345 | $1,000 | Not Implemented |
UA0151 # 02 Y:2015 | 02 | 2015 | INCREASE AMOUNT OF CONDENSATE RETURNED | $48,953 | $110,000 | Implemented |