IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12

matching recommendations
Reset
ARC 2.5 Industrial Design
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0127 # 05 Y:1997 05 1997 REDESIGN PROCESS $519 $50 Not Implemented
AM0305 # 01 Y:1997 01 1997 REDESIGN PROCESS $101,500 $110,000 Not Implemented
UF0185 # 03 Y:1997 03 1997 CONVERT TO INDIRECT TEMPERATURE CONTROL SYSTEM $20,417 $19,200 Implemented
UD0519 # 01 Y:1997 01 1997 USE GRAVITY FEEDS WHEREVER POSSIBLE $9,099 $5,828 Implemented
UF0177 # 03 Y:1997 03 1997 SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE $152 $680 Not Implemented
UD0515 # 08 Y:1997 08 1997 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $1,875 $0 Not Implemented
GT0608 # 06 Y:1997 06 1997 USE GRAVITY FEEDS WHEREVER POSSIBLE $3,425 $5,130 Implemented
GT0608 # 07 Y:1997 07 1997 USE GRAVITY FEEDS WHEREVER POSSIBLE $2,568 $14,250 Not Implemented
WV0111 # 07 Y:1997 07 1997 USE SHAFT TYPE FURNACES FOR PREHEATING INCOMING MATERIAL $38,225 $20,000 Not Implemented
ME0208 # 08 Y:1997 08 1997 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $354 $0 Not Implemented
SD0163 # 03 Y:1997 03 1997 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $27,336 $4,000 Implemented
OR0289 # 02 Y:1997 02 1997 REDESIGN PROCESS $42,400 $4,300 Not Implemented