IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

197

matching recommendations
Reset
ARC 2.3 Electrical Power
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0043 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $34,391 $20,500 Not Implemented
TR0037 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $4,104 $9,500 Implemented
CW0126 # 06 Y:2022 06 2022 USE POWER DURING OFF-PEAK PERIODS $921 $0 n/a
NL0076 # 07 Y:2022 07 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,084 $35 Not Implemented
CM1013 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,342 $3,480 Not Implemented
UF0588 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $84,856 $35,131 Not Implemented
IP0167 # 09 Y:2022 09 2022 OPTIMIZE PLANT POWER FACTOR $11,341 $26,639 Implemented
UL2217 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $32,626 $94,199 Implemented
UA0267 # 01 Y:2022 01 2022 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $13,660 $51,749 Not Implemented
UA0267 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $2,388 $1,682 Not Implemented
CI0005 # 10 Y:2022 10 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $323 $0 Not Implemented
CI0005 # 06 Y:2022 06 2022 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $2,348 $8,100 Not Implemented
UL2216 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $67,103 $45,461 Implemented
SU0528 # 05 Y:2022 05 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,343 $660 Not Implemented
IP0166 # 11 Y:2022 11 2022 OPTIMIZE PLANT POWER FACTOR $11,046 $43,200 Implemented
IP0165 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $6,564 $11,200 Not Implemented
UC2206 # 07 Y:2022 07 2022 USE BATTERY STORAGE FOR DEMAND CONTROL $27,967 $231,837 Not Implemented
UC2206 # 01 Y:2022 01 2022 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $31,115 $0 Not Implemented
KS2209 # 08 Y:2022 08 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $79,738 $627,000 Not Implemented
TR0032 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $6,520 $17,100 Not Implemented
UL2215 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $7,332 $3,015 Not Implemented
UC2205 # 06 Y:2022 06 2022 USE BATTERY STORAGE FOR DEMAND CONTROL $65,817 $383,577 Not Implemented
UF0587 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $14,312 $11,024 Not Implemented
UF0587 # 01 Y:2022 01 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $133,034 $448,875 Not Implemented
UC2205 # 02 Y:2022 02 2022 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $19,018 $0 Not Implemented