IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
Reset
ARC 2.5 Industrial Design
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0192 # 04 Y:2015 04 2015 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $8,654 $19,200 Not Implemented
OR0662 # 04 Y:2015 04 2015 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $2,998 $864 Not Implemented
UK1515 # 10 Y:2015 10 2015 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $838 $0 Implemented
UA0149 # 04 Y:2015 04 2015 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $51,808 $3,396 Not Implemented
DL0153 # 02 Y:2015 02 2015 REDUCE FLUID FLOW RATES $13,200 $10,000 Implemented
WM0075 # 01 Y:2015 01 2015 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $331,900 $300,000 Not Implemented
LE0401 # 12 Y:2015 12 2015 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $1,822 $6,360 Implemented
OK0921 # 05 Y:2015 05 2015 REDUCE FLUID FLOW RATES $32,332 $5,000 Implemented
NC0547 # 09 Y:2015 09 2015 REDESIGN PROCESS $461 $2,000 Not Implemented
UD0932 # 08 Y:2015 08 2015 REDUCE FLUID FLOW RATES $2,162 $1,000 Not Implemented
UD0931 # 08 Y:2015 08 2015 REDUCE FLUID FLOW RATES $14,443 $14,964 Not Implemented
NC0545 # 14 Y:2015 14 2015 REDUCE FLUID FLOW RATES $8,008 $11,000 Not Implemented
UM0461 # 06 Y:2015 06 2015 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $195 $1,000 Not Implemented
NC0542 # 07 Y:2015 07 2015 REDESIGN PROCESS $2,648 $500 Not Implemented
MZ0186 # 02 Y:2015 02 2015 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $5,641 $18,600 Not Implemented
NC0532 # 11 Y:2015 11 2015 REDUCE FLUID FLOW RATES $8,338 $5,000 Not Implemented