IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

116

matching recommendations
Reset
ARC 3 WASTE MINIMIZATION / POLLUTION PREVENTION
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0117 # 05 Y:2020 05 2020 RECYCLE WHITE WATER $2,598 $6,039 Implemented
CW0117 # 06 Y:2020 06 2020 USE A DIFFERENT OR RECYCLED RAW MATERIAL $217,090 $846,410 Implemented
MI0383 # 04 Y:2020 04 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,698 $1,306 Implemented
MI0382 # 06 Y:2020 06 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,088 $1,306 Not Implemented
NC0658 # 04 Y:2020 04 2020 REPLACE TREATED WATER WITH WELL / SURFACE WATER $92,941 $500 n/a
AM0817 # 04 Y:2020 04 2020 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $2,950 $200 Not Implemented
AM0817 # 01 Y:2020 01 2020 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $23,040 $20,000 Not Implemented
UF0558 # 04 Y:2020 04 2020 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $1,517,489 $143,275 Implemented
UF0558 # 05 Y:2020 05 2020 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $40,098 $110,800 Implemented
SU0501 # 03 Y:2020 03 2020 ELIMINATE/REDUCE AN OPERATION $2,583 $2,772 Not Implemented
SU0501 # 01 Y:2020 01 2020 ELIMINATE/REDUCE AN OPERATION $557 $20 Not Implemented
MI0379 # 02 Y:2020 02 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,551 $2,080 Not Implemented
SD0602 # 06 Y:2020 06 2020 REDUCE SCRAP PRODUCTION $68,040 $68,000 Not Implemented
CW0115 # 06 Y:2020 06 2020 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $28 $188 Implemented
CW0115 # 05 Y:2020 05 2020 RECOVER AND REUSE COOLING WATER $3,922 $10,595 Not Implemented
BS0143 # 01 Y:2020 01 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $36,379 $1,225,000 Not Implemented
BS0143 # 03 Y:2020 03 2020 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $68,374 $200,000 Not Implemented
CW0114 # 02 Y:2020 02 2020 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $10,400 $0 Implemented
UD1024 # 03 Y:2020 03 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $37,324 $1,300 Not Implemented
UD1024 # 02 Y:2020 02 2020 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $44,273 $40,000 Not Implemented
CL2014 # 03 Y:2020 03 2020 REPLACE TREATED WATER WITH WELL / SURFACE WATER $922 $862 Not Implemented
UD1024 # 04 Y:2020 04 2020 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $15,421 $0 Not Implemented
SD0600 # 01 Y:2020 01 2020 REDUCE SCRAP PRODUCTION $80,293 $41,423 Not Implemented
WV0601 # 02 Y:2020 02 2020 RECOVER AND REUSE WASTE MATERIAL $15,085 $15,000 Implemented
WV0601 # 01 Y:2020 01 2020 USE EVAPORATION TO CONCENTRATE MATERIAL $24,050 $90,000 Implemented