IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,503

matching recommendations
Reset
ARC 4 DIRECT PRODUCTIVITY ENHANCEMENTS
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0571 # 03 Y:2024 03 2024 PAY BILLS ON TIME TO AVOID LATE FEES $22,882 $38 n/a
LS2406 # 03 Y:2024 03 2024 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $9,410 $28,500 n/a
UF0610 # 10 Y:2024 10 2024 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $15,675 $25,000 n/a
UF0610 # 09 Y:2024 09 2024 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $54,895 $0 n/a
UF0610 # 11 Y:2024 11 2024 INSTALL AN UNINTERUPTABLE POWER SUPPLY $4,482 $3,330 n/a
UW2403 # 03 Y:2024 03 2024 LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD $222,893 $500,000 n/a
SU0547 # 03 Y:2024 03 2024 PAY BILLS ON TIME TO AVOID LATE FEES $147 $0 n/a
AS0572 # 01 Y:2024 01 2024 INSTALL BACK-UP EQUIPMENT $53,208 $12,653 n/a
AM0908 # 04 Y:2024 04 2024 INSTALL AN UNINTERUPTABLE POWER SUPPLY $10,125 $25,600 n/a
UW2402 # 04 Y:2024 04 2024 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $55,000 $117,000 n/a
UF0609 # 06 Y:2024 06 2024 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $35,940 $0 n/a
UF0609 # 07 Y:2024 07 2024 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $21,071 $25,000 n/a
UW2401 # 01 Y:2024 01 2024 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $141,044 $149,500 n/a
AS0570 # 03 Y:2023 03 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,395 $4,200 n/a
LE0559 # 04 Y:2024 04 2024 INSTALL AN UNINTERUPTABLE POWER SUPPLY $11,423 $30,000 n/a
DL0236 # 05 Y:2024 05 2024 INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM $18,917 $52,500 n/a
UA0283 # 05 Y:2023 05 2023 PAY BILLS ON TIME TO AVOID LATE FEES $21,298 $0 n/a
SF0614 # 11 Y:2024 11 2024 ADOPT IN-HOUSE MATERIAL GENERATION $115,467 $137,973 n/a
LS2405 # 05 Y:2024 05 2024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $155,225 $550,000 n/a
LS0224 # 05 Y:2024 05 2024 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $175,678 $600,000 n/a
UF0607 # 06 Y:2023 06 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $183,418 $60,000 n/a
UD1075 # 07 Y:2024 07 2024 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $712,662 $195,000 n/a
AS0567 # 02 Y:2023 02 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $86,125 $165,996 n/a
UC2317 # 09 Y:2023 09 2023 ADOPT IN-HOUSE MATERIAL GENERATION $30,659 $188,853 n/a
OR0785 # 01 Y:2023 01 2023 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,209,151 $28,500 n/a