IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,125

matching recommendations
Reset
ARC 2.26 COOLING
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0488 # 08 Y:2016 08 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $16,810 $61,903 Not Implemented
SF0489 # 01 Y:2016 01 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $29,223 $350 Implemented
UK1605 # 12 Y:2016 12 2016 CLEAN CONDENSER TUBES $5,812 $63 Not Implemented
UA0166 # 03 Y:2016 03 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $26,248 $80 Implemented
UA0166 # 05 Y:2016 05 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,707 $120 Implemented
SD0535 # 07 Y:2016 07 2016 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $710 $3,100 Not Implemented
SD0534 # 05 Y:2016 05 2016 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $2,674 $2,863 Not Implemented
MA0761 # 01 Y:2016 01 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $22,997 $134,000 Not Implemented
BS0079 # 03 Y:2016 03 2016 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $232 $850 Not Implemented
LE0422 # 12 Y:2016 12 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $55,094 $185,000 Not Implemented
UD0952 # 03 Y:2016 03 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,277 $0 Not Implemented
OK0947 # 01 Y:2016 01 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $11,871 $92,000 Not Implemented
TT0175 # 06 Y:2016 06 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $3,374 $400 Implemented
AM0711 # 01 Y:2016 01 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $62,500 $108,300 Not Implemented
NC0568 # 08 Y:2016 08 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $8,890 $25,230 Not Implemented
MI0299 # 01 Y:2016 01 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $39,996 $70,000 Not Implemented
WM0089 # 05 Y:2016 05 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $11,093 $0 Not Implemented
IP0069 # 03 Y:2016 03 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $5,637 $3 Not Implemented
SF0485 # 05 Y:2016 05 2016 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $40,459 $14,272 Not Implemented
OK0942 # 04 Y:2016 04 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $73,902 $31,000 Not Implemented
SF0481 # 08 Y:2016 08 2016 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $119,304 $36,151 Not Implemented
OK0939 # 06 Y:2016 06 2016 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $3,761 $0 Implemented
SF0483 # 03 Y:2016 03 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $9,855 $16,147 Implemented
SF0482 # 03 Y:2016 03 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $19,190 $13,256 Implemented
SF0482 # 02 Y:2016 02 2016 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $4,678 $0 Not Implemented