IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,296

matching recommendations
Reset
ARC 2.1 Combustion Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0665 # 08 Y:2024 08 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,306 $1,070 n/a
UU0251 # 07 Y:2024 07 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $2,290 $5,750 n/a
UW2409 # 05 Y:2024 05 2024 REPLACE BOILER $61,679 $155,400 n/a
SJ0020 # 08 Y:2024 08 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $2,868 $15,989 n/a
SJ0020 # 07 Y:2024 07 2024 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $2,380 $0 n/a
MI0443 # 04 Y:2024 04 2024 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $7,616 $18,760 n/a
WV0664 # 01 Y:2024 01 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,899 $1,019 n/a
SU0552 # 13 Y:2024 13 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $9,592 $16,120 n/a
SU0552 # 10 Y:2024 10 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $466 $271 n/a
AM0921 # 03 Y:2024 03 2024 REPAIR FAULTY LOUVERS AND DAMPERS $2,461 $6,000 n/a
OK1114 # 03 Y:2024 03 2024 OPERATE BOILERS ON HIGH FIRE SETTING $3,357 $16,000 n/a
LS2409 # 05 Y:2024 05 2024 IMPROVE COMBUSTION CONTROL CAPABILITY $18,443 $20,000 n/a
MZ0361 # 03 Y:2024 03 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,797 $4,800 n/a
MZ0361 # 06 Y:2024 06 2024 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $45,827 $6,720 n/a
AM0920 # 04 Y:2024 04 2024 REPAIR FAULTY LOUVERS AND DAMPERS $4,125 $9,000 n/a
WV0662 # 11 Y:2024 11 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $428 $945 n/a
DL0239 # 03 Y:2024 03 2024 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $37,050 $110,000 n/a
UU0248 # 05 Y:2024 05 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $6,380 $133,800 n/a
WV0661 # 11 Y:2024 11 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $218 $713 n/a
LS2408 # 03 Y:2024 03 2024 REPLACE BOILER $57,645 $247,500 n/a
DL0238 # 07 Y:2024 07 2024 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $212,600 $900,000 n/a
UU0250 # 03 Y:2024 03 2024 BURN A LESS EXPENSIVE GRADE OF FUEL $11,024 $16,000 n/a
LS2408 # 02 Y:2024 02 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $37,002 $144,549 n/a
SF0618 # 03 Y:2024 03 2024 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $705,605 $250,000 n/a
OK1111 # 05 Y:2024 05 2024 OPERATE BOILERS ON HIGH FIRE SETTING $935 $22,000 n/a