IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
ARC 2.1 Combustion Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0439 # 15 Y:2011 15 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $631 $1,000 Implemented
CO0652 # 01 Y:2011 01 2011 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $11,990 $34,320 Implemented
MZ0068 # 01 Y:2011 01 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,373 $1,770 Implemented
UD0844 # 11 Y:2011 11 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,123 $1,000 Implemented
MZ0069 # 07 Y:2011 07 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $36,400 $0 Implemented
NC0438 # 02 Y:2011 02 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $8,972 $7,800 Implemented
MI0211 # 06 Y:2011 06 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,771 $1,950 Implemented
OK0816 # 08 Y:2011 08 2011 REPLACE BOILER $26,135 $24,220 Implemented
NC0436 # 08 Y:2011 08 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,009 $1,000 Implemented
MA0679 # 01 Y:2011 01 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $70,691 $20,000 Implemented
MA0679 # 02 Y:2011 02 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $45,173 $20,100 Implemented
MA0679 # 04 Y:2011 04 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,015 $30,000 Implemented
OR0576 # 01 Y:2011 01 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $10,860 $1,000 Implemented
LE0326 # 11 Y:2011 11 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,230 $35,000 Implemented
IA0471 # 05 Y:2011 05 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $465 $3,000 Implemented
MA0677 # 06 Y:2011 06 2011 IMPROVE COMBUSTION CONTROL CAPABILITY $362 $500 Implemented
IA0469 # 08 Y:2011 08 2011 DIRECT WARMEST AIR TO COMBUSTION INTAKE $9,865 $1,500 Implemented
IA0468 # 06 Y:2011 06 2011 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,025 $150 Implemented
IA0468 # 10 Y:2011 10 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,265 $1,000 Implemented
NC0432 # 02 Y:2011 02 2011 REPAIR FAULTY LOUVERS AND DAMPERS $7,824 $2,500 Implemented
WV0436 # 10 Y:2011 10 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,400 $1,000 Implemented
OR0572 # 07 Y:2011 07 2011 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,280 $500 Implemented
IA0466 # 09 Y:2011 09 2011 IMPROVE COMBUSTION CONTROL CAPABILITY $482 $480 Implemented
UD0841 # 17 Y:2011 17 2011 INSTALL AUTOMATIC STACK DAMPER $20,941 $600 Implemented
WV0432 # 10 Y:2011 10 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $762 $1,000 Implemented