IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,915

matching recommendations
Reset
ARC 2.2 Thermal Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0851 # 07 Y:2023 07 2023 AVOID FROST FORMATION ON EVAPORATORS $434 $216 Implemented
MZ0338 # 02 Y:2023 02 2023 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,823 $860 Implemented
UU0215 # 08 Y:2023 08 2023 INSULATE BARE EQUIPMENT $228 $1,725 Implemented
DL0218 # 03 Y:2023 03 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $3,402 $750 Implemented
DL0218 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $11,159 $10,000 Implemented
LS1223 # 01 Y:2023 01 2023 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $803 $0 Implemented
DL0216 # 06 Y:2023 06 2023 RECOVER WASTE HEAT FROM EQUIPMENT $12,154 $50,000 Implemented
IC0274 # 01 Y:2023 01 2023 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $233 $359 Implemented
UL2217 # 06 Y:2022 06 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,602 $50,000 Implemented
SF0596 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $1,185 $2,397 Implemented
AM0871 # 01 Y:2023 01 2023 INSULATE BARE EQUIPMENT $7,430 $10,320 Implemented
CM1009 # 02 Y:2022 02 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,200 $201,300 Implemented
SF0595 # 02 Y:2023 02 2023 USE OPTIMUM THICKNESS INSULATION $2,174 $1,800 Implemented
IP0164 # 06 Y:2022 06 2022 RECOVER WASTE HEAT FROM EQUIPMENT $972 $1,279 Implemented
TT0285 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $31,920 $13,000 Implemented
TT0285 # 08 Y:2023 08 2023 INSULATE BARE EQUIPMENT $616 $2,793 Implemented
UA0264 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $9,549 $8,397 Implemented
UU0211 # 04 Y:2023 04 2023 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $3,351 $26,250 Implemented
MZ0336 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $31,782 $11,200 Implemented
NL0075 # 04 Y:2022 04 2022 INSULATE BARE EQUIPMENT $980 $404 Implemented
TT0284 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $8,764 $13,000 Implemented
TR0030 # 04 Y:2022 04 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,744 $7,758 Implemented
OK1083 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $29 $123 Implemented
SF0593 # 06 Y:2023 06 2023 USE OPTIMUM THICKNESS INSULATION $863 $905 Implemented
SF0593 # 08 Y:2023 08 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,486 $9,050 Implemented