IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,009

matching recommendations
Reset
ARC 2.2 Thermal Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0538 # 02 Y:2023 02 2023 RECOVER WASTE HEAT FROM EQUIPMENT $2,656 $1,200 Not Implemented
LE0538 # 04 Y:2023 04 2023 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $3,452 $1,992 Not Implemented
UU0211 # 04 Y:2023 04 2023 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $3,351 $26,250 Implemented
MZ0336 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $31,782 $11,200 Implemented
NL0075 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $7,755 $28,900 Not Implemented
NL0075 # 04 Y:2022 04 2022 INSULATE BARE EQUIPMENT $980 $404 Implemented
MS0407 # 01 Y:2022 01 2022 USE OPTIMUM THICKNESS INSULATION $276 $1,511 n/a
MU0022 # 01 Y:2022 01 2022 USE OPTIMUM TEMPERATURE $321 $0 Not Implemented
TT0284 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $8,764 $13,000 Implemented
OR0763 # 02 Y:2023 02 2023 INSULATE BARE EQUIPMENT $5,819 $13,838 Not Implemented
OK1083 # 01 Y:2023 01 2023 RECOVER WASTE HEAT FROM EQUIPMENT $1,764 $522 Not Implemented
OK1083 # 02 Y:2023 02 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,133 $12,880 Not Implemented
OK1083 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $29 $123 Implemented
TR0030 # 04 Y:2022 04 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,744 $7,758 Implemented
LE0537 # 04 Y:2023 04 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $6,501 $7,500 Not Implemented
LE0537 # 06 Y:2023 06 2023 PREHEAT COMBUSTION AIR WITH WASTE HEAT $23,891 $70,000 Not Implemented
SF0593 # 02 Y:2023 02 2023 COVER OPEN TANKS $5,939 $1,586 Not Implemented
SF0593 # 06 Y:2023 06 2023 USE OPTIMUM THICKNESS INSULATION $863 $905 Implemented
SF0593 # 08 Y:2023 08 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,486 $9,050 Implemented
SU0525 # 07 Y:2022 07 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $12,346 $12,588 Not Implemented
SU0525 # 09 Y:2022 09 2022 INSTALL / REPAIR INSULATION ON STEAM LINES $207 $487 Not Implemented
MU0020 # 01 Y:2022 01 2022 USE OPTIMUM TEMPERATURE $671 $0 Not Implemented
MU0020 # 02 Y:2022 02 2022 USE OPTIMUM TEMPERATURE $226,577 $176,800 Implemented
LS0323 # 03 Y:2023 03 2023 CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING $3,384 $2,100 Not Implemented
AM0862 # 01 Y:2023 01 2023 REPAIR OR REPLACE STEAM TRAPS $80,175 $8,170 Implemented