IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

64

matching recommendations
Reset
ARC 2.26 COOLING
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0958 # 11 Y:2016 11 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $16,955 $100,000 Implemented
SF0494 # 05 Y:2016 05 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,493 $5,050 Not Implemented
MA0768 # 09 Y:2016 09 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $122 $300 Not Implemented
MI0304 # 03 Y:2016 03 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $16,987 $25,335 Not Implemented
CO0736 # 01 Y:2016 01 2016 AVOID FROST FORMATION ON EVAPORATORS $8,830 $19,500 n/a
LE0426 # 06 Y:2016 06 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $16,120 $35,000 Not Implemented
IA0567 # 05 Y:2016 05 2016 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $1,259 $500 Not Implemented
UD0956 # 11 Y:2016 11 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,070 $2,500 Not Implemented
UD0956 # 10 Y:2016 10 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,204 $10,000 Not Implemented
UD0956 # 09 Y:2016 09 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,433 $40,000 Not Implemented
SF0491 # 01 Y:2016 01 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $9,190 $300 Not Implemented
NC0574 # 02 Y:2016 02 2016 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $15,850 $30,000 Not Implemented
OK0949 # 01 Y:2016 01 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $17,826 $50,400 Not Implemented
OK0949 # 02 Y:2016 02 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,613 $3,847 Not Implemented
WV0532 # 01 Y:2016 01 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $35,091 $2,025 Not Implemented
MI0302 # 01 Y:2016 01 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $12,170 $29,740 Implemented
SF0488 # 08 Y:2016 08 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $16,810 $61,903 Not Implemented
SF0489 # 01 Y:2016 01 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $29,223 $350 Implemented
UK1605 # 12 Y:2016 12 2016 CLEAN CONDENSER TUBES $5,812 $63 Not Implemented
UA0166 # 05 Y:2016 05 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,707 $120 Implemented
SD0535 # 07 Y:2016 07 2016 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $710 $3,100 Not Implemented
UA0166 # 03 Y:2016 03 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $26,248 $80 Implemented
SD0534 # 05 Y:2016 05 2016 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $2,674 $2,863 Not Implemented
MA0761 # 01 Y:2016 01 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $22,997 $134,000 Not Implemented
BS0079 # 03 Y:2016 03 2016 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $232 $850 Not Implemented