Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

175

matching recommendations
Reset
ARC 2.3 Electrical Power
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0360 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $5,613 $13,630 Implemented
UK1910 # 12 Y:2019 12 2019 OPTIMIZE PLANT POWER FACTOR $13,040 $16,170 Implemented
AS0478 # 01 Y:2019 01 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $25,716 $2,242 Implemented
AM0786 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $11,700 $15,300 Implemented
IP0126 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $73,256 $43,486 Not Implemented
AM0785 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $1,340 $5,250 Not Implemented
AM0785 # 04 Y:2019 04 2019 OPTIMIZE PLANT POWER FACTOR $4,685 $6,865 Implemented
UU0154 # 01 Y:2019 01 2019 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $567,696 $2,355,000 Not Implemented
UU0154 # 06 Y:2019 06 2019 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,947 $2,000 Not Implemented
UU0154 # 02 Y:2019 02 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $262,908 $2,299,950 Not Implemented
MI0358 # 01 Y:2019 01 2019 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $713,110 $8,242,656 Implemented
UF0533 # 05 Y:2019 05 2019 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $1,160 $4,000 Implemented
TT0227 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,143 $2,500 Not Implemented
NL0038 # 01 Y:2019 01 2019 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,358 $20,000 Not Implemented
MZ0278 # 03 Y:2019 03 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $176,232 $3,250 Implemented
GT0929 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $720 $2,415 Not Implemented
IP0124 # 01 Y:2019 01 2019 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $62,247 $480 Not Implemented
BS0125 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $2,168 $10,162 Not Implemented
WV0583 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,666 $2,560 Not Implemented
CL1913 # 05 Y:2019 05 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $92,958 $400,000 Not Implemented
IP0123 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $5,541 $9,685 Not Implemented
UU0153 # 03 Y:2019 03 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $22,776 $146,977 Not Implemented
IP0123 # 02 Y:2019 02 2019 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $248 $0 Implemented
NC0636 # 04 Y:2019 04 2019 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $27,892 $85,000 Not Implemented
IP0122 # 03 Y:2019 03 2019 OPTIMIZE PLANT POWER FACTOR $9,556 $3,958 Not Implemented